Endre søk
Link to record
Permanent link

Direct link
BETA
Scorpo, Alberto Liuzzo
Publikasjoner (9 av 9) Visa alla publikasjoner
Scorpo, A. L., Nordell, B. & Gehlin, S. (2017). A method to estimate the hydraulic conductivity of the ground by TRT analysis (ed.). Ground Water, 55(1), 110-118
Åpne denne publikasjonen i ny fane eller vindu >>A method to estimate the hydraulic conductivity of the ground by TRT analysis
2017 (engelsk)Inngår i: Ground Water, ISSN 0017-467X, E-ISSN 1745-6584, Vol. 55, nr 1, s. 110-118Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

An accurate knowledge of aquifers properties is important 2 in many disciplines, from hydrology to site characterization in order to designing and implementing remediation strategies, as well as geothermal ground source technologies. In par5 ticular, the groundwater flow rate is a fundamental parameter to be considered in the ground-coupled heat exchangers (GCHEs) design, together with the thermal properties of the ground. In fact, even relatively low flow rate entail temperature changes considerably lower than in the case of pure heat conduction (Gehlin and Hellström, 2003; Fan et al., 2007) and then relatively stable underground temper10 atures which allow heat pumps to operate with very efficient performance coefficients, thereby reducing energy costs (Lee et al., 2012). Moreover, an accurate knowledge of groundwater velocity and ground thermal properties allows a better design and dimensioning of the GCHE, with further reduction of costs. The objective of this paper is to propose an expeditious, graphical method to estimate the groundwater flow velocity from TRT analysis.  

sted, utgiver, år, opplag, sider
John Wiley & Sons, 2017
HSV kategori
Forskningsprogram
Vattenteknik
Identifikatorer
urn:nbn:se:ltu:diva-15163 (URN)10.1111/gwat.12443 (DOI)000393955900013 ()27479510 (PubMedID)2-s2.0-84979980505 (Scopus ID)ea5adb4b-6837-4e92-bb64-900c878fe4fc (Lokal ID)ea5adb4b-6837-4e92-bb64-900c878fe4fc (Arkivnummer)ea5adb4b-6837-4e92-bb64-900c878fe4fc (OAI)
Merknad

Validerad; 2017; Nivå 2; 2017-02-02 (andbra)

Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2018-09-14bibliografisk kontrollert
Nordell, B., Scorpo, A. L., Andersson, O., Rydell, L. & Carlsson, B. (2016). Long-term Long Term Evaluation of Operation and Design of the Emmaboda BTES.: Operation and Experiences 2010-2015 (ed.). Paper presented at . Luleå: Luleå tekniska universitet
Åpne denne publikasjonen i ny fane eller vindu >>Long-term Long Term Evaluation of Operation and Design of the Emmaboda BTES.: Operation and Experiences 2010-2015
Vise andre…
2016 (engelsk)Rapport (Annet vitenskapelig)
Abstract [en]

The large-scale borehole layer (BTES) in Emmaboda was commissioned in 2010. Its aim was to make use of waste heat from the industrial processes at the Xylem plant. During all the years since its inception, additional heat sources have been included, and only now can the predicted annually amount of stored heat (3.6 GWh/year) be achieved. The average storage temperature is now 40-45oC. Very little of the injected heat has so been recovered (200 MWh) because the storage temperature was lower than expected. The reason for this is mainly that the amount of stored heat (12,000 MWh) is less than expected and that this heat also held a lower temperature than expected. Performed simulations based on actual storage data and presumed future operating data, show that the simulation model reasonably well predicts the future storage function. Initial circulation problems in the storage have been solved with the use of vacuum pumps for degassing of the liquid. The BTES has reduced the amount of annually purchased district heating by about 4 GWh. To further improve the system and reduce the heat losses, it is proposed to install a heat pump to heat withdrawal. This would enable the system to deliver high enough supply temperature for heating of the buildings. The system could then be operated according to planned annual heat injection/ extraction (3.6 GWh/2.7 GWh).

sted, utgiver, år, opplag, sider
Luleå: Luleå tekniska universitet, 2016. s. 63
Serie
Forskningsrapport / Luleå tekniska universitet, ISSN 1402-1528
Emneord
large scale heat storage, borehole system, waste heat, operation experience, measurements, BTES, Emmaboda, Civil engineering and architecture - Building engineering, Samhällsbyggnadsteknik och arkitektur - Byggnadsteknik
HSV kategori
Forskningsprogram
Vattenteknik
Identifikatorer
urn:nbn:se:ltu:diva-22591 (URN)3710093e-c824-4728-8622-acf72697043d (Lokal ID)978-91-7583-530-3 (ISBN)3710093e-c824-4728-8622-acf72697043d (Arkivnummer)3710093e-c824-4728-8622-acf72697043d (OAI)
Merknad
Godkänd; 2016; 20160204 (bon)Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2017-11-24bibliografisk kontrollert
Scorpo, A. L., Nordell, B. & Gehlin, S. (2015). Influence of regional groundwater flow on ground temperature around heat extraction boreholes (ed.). Paper presented at . Geothermics, 56, 119-127
Åpne denne publikasjonen i ny fane eller vindu >>Influence of regional groundwater flow on ground temperature around heat extraction boreholes
2015 (engelsk)Inngår i: Geothermics, ISSN 0375-6505, E-ISSN 1879-3576, Vol. 56, s. 119-127Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

The increasing popularity of ground-coupled heat pumps has resulted in almost20% of all Swedish family houses being heated this way. To avoid undesirableinteractions between neighboring boreholes and disturbance of the ground temperature, the general rule and recommendation of Swedish authorities is that the distance between two neighboring boreholes must be ≥ 20 m. However, according to previous studies, relatively low groundwater flow rates may significantly reduce the borehole excess temperature compared to the case of pure heat conduction. In this work the Influence Length is defined and its relations with flow rate, real thermal conductivity of the ground and effective thermal conductivity obtained by thermal response analysis are investigated. The aim of this study was to find a way to use the thermal response test as a means to determine the groundwater flow influence in order to reduce the borehole spacing perpendicular to groundwater flow direction. The results confirm that very low groundwater flow rates are enough to significantly reduce the Influence Length, hence this is a crucial parameter which should be considered. Moreover, a first estimation, even before the thermal response test analysis, of the Influence Length is possible if the knowledge of hydrogeological conditions of the site allows good predictions about real thermal conductivity of the ground and flow rate.

HSV kategori
Forskningsprogram
Vattenteknik
Identifikatorer
urn:nbn:se:ltu:diva-5922 (URN)10.1016/j.geothermics.2015.04.002 (DOI)000358095700010 ()2-s2.0-84928659993 (Scopus ID)41c38152-f6d4-4e74-934d-74fdd3800d3a (Lokal ID)41c38152-f6d4-4e74-934d-74fdd3800d3a (Arkivnummer)41c38152-f6d4-4e74-934d-74fdd3800d3a (OAI)
Merknad
Validerad; 2015; Nivå 2; 20131009 (bon)Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2018-07-10bibliografisk kontrollert
Nordell, B., Andersson, O., Rydell, L. & Scorpo, A. L. (2015). Long-term Performance of the HT-BTES in Emmaboda, Sweden (ed.). Paper presented at Greenstock 2015 : International Conference on Underground Thermal Energy Storage 19/05/2015 - 21/05/2015. Paper presented at Greenstock 2015 : International Conference on Underground Thermal Energy Storage 19/05/2015 - 21/05/2015.
Åpne denne publikasjonen i ny fane eller vindu >>Long-term Performance of the HT-BTES in Emmaboda, Sweden
2015 (engelsk)Konferansepaper, Oral presentation only (Fagfellevurdert)
Abstract [en]

The Emmaboda HT-BTES was taken into operation 2010. Since then ~10 GWh has been stored, only a fraction has been extracted, and a storage temperature of 40-45 oC has been reached. The purpose of the BTES is to utilize waste heat from the industrial processes. Heat sources have been added annually and in 2015 the predicted heat injection (3.6 GWh/year) will be reached. Performed simulations are based on actual heat injection and extraction. The simulation model can reasonably well predict the future operation of the BTES. Initial problems with circulating the heat carrier at a slight vacuum pressure have been solved by using vacuum pumps to degas the fluid. The BTES has reduced the amount of bought district heating by approximately 4 GWh/year. To improve the system further, and reduce heat losses, it is suggested that a heat pump should be installed for heat extraction.

Emneord
Waste Heat, BTES, Energy Storage, Natural sciences - Physics, Civil engineering and architecture - Geoengineering and mining engineering, Naturvetenskap - Fysik, Samhällsbyggnadsteknik och arkitektur - Geoteknik och gruvteknik
HSV kategori
Forskningsprogram
Vattenteknik
Identifikatorer
urn:nbn:se:ltu:diva-32614 (URN)72a42f96-e8c1-448c-88cd-aff5f7936a59 (Lokal ID)72a42f96-e8c1-448c-88cd-aff5f7936a59 (Arkivnummer)72a42f96-e8c1-448c-88cd-aff5f7936a59 (OAI)
Konferanse
Greenstock 2015 : International Conference on Underground Thermal Energy Storage 19/05/2015 - 21/05/2015
Merknad
Godkänd; 2015; 20150420 (bon)Tilgjengelig fra: 2016-09-30 Laget: 2016-09-30 Sist oppdatert: 2017-11-25bibliografisk kontrollert
Nordell, B., Scorpo, A. L., Andersson, O. & Rydell, L. (2014). The HT BTES plant in Emmaboda: Report from the first three years of operation 2010-2013 (ed.). Paper presented at . Luleå: Luleå tekniska universitet
Åpne denne publikasjonen i ny fane eller vindu >>The HT BTES plant in Emmaboda: Report from the first three years of operation 2010-2013
2014 (engelsk)Rapport (Annet vitenskapelig)
Abstract [en]

The Emmaboda HT-BTES was taken into operation 2010. Since then ~10 GWh has been stored, only a fraction has been extracted, and a storage temperature of 40-45 oC has been reached. The purpose of the BTES is to utilize waste heat from the industrial processes. Heat sources have been added annually and in 2015 the predicted heat injection (3.6 GWh/year) will be reached. Performed simulations are based on actual heat injection and extraction. The simulation model can reasonably well predict the future operation of the BTES. Initial problems with circulating the heat carrier at a slight vacuum pressure have been solved by using vacuum pumps to degas the fluid. The BTES has reduced the amount of bought district heating by approximately 4 GWh/year. To improve the system further, and reduce heat losses, it is suggested that a heat pump should be installed for heat extraction.

sted, utgiver, år, opplag, sider
Luleå: Luleå tekniska universitet, 2014. s. 36
Emneord
Energy Storage, Field testing, boreholes, Emmaboda, Civil engineering and architecture - Building engineering, Samhällsbyggnadsteknik och arkitektur - Byggnadsteknik
HSV kategori
Forskningsprogram
Vattenteknik
Identifikatorer
urn:nbn:se:ltu:diva-24473 (URN)b1ebbe4e-bffa-40e1-ba0e-37c1c631efa5 (Lokal ID)b1ebbe4e-bffa-40e1-ba0e-37c1c631efa5 (Arkivnummer)b1ebbe4e-bffa-40e1-ba0e-37c1c631efa5 (OAI)
Merknad
Godkänd; 2014; 20151204 (bon)Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2017-11-24bibliografisk kontrollert
Piller, M. & Scorpo, A. L. (2013). Numerical investigation of forced convection from vertical boreholes (ed.). Paper presented at . Geothermics, 45, 41-56
Åpne denne publikasjonen i ny fane eller vindu >>Numerical investigation of forced convection from vertical boreholes
2013 (engelsk)Inngår i: Geothermics, ISSN 0375-6505, E-ISSN 1879-3576, Vol. 45, s. 41-56Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

In this work, the transient forced convection from vertical boreholes is investigatedby numerical simulation. The actual borehole geometry is accounted for, resultingin perturbed flow and temperature fields. The present results are compared withthe analytical line heat source model derived by Diao et al. (2004). A wide rangeof viable Peclet numbers is considered.

HSV kategori
Identifikatorer
urn:nbn:se:ltu:diva-3992 (URN)10.1016/j.geothermics.2012.10.001 (DOI)1d93d80b-b396-4eed-a129-592601b9e55c (Lokal ID)1d93d80b-b396-4eed-a129-592601b9e55c (Arkivnummer)1d93d80b-b396-4eed-a129-592601b9e55c (OAI)
Merknad
Upprättat; 2013; 20120823 (albliu)Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2017-11-24bibliografisk kontrollert
Scorpo, A. L. & Piller, M. (2012). Numerical determination of heat transfer in ground heat exchangers with groundwater advection (ed.). Paper presented at European Geothermal PhD day : 29/03/2012 - 29/03/2012. Paper presented at European Geothermal PhD day : 29/03/2012 - 29/03/2012.
Åpne denne publikasjonen i ny fane eller vindu >>Numerical determination of heat transfer in ground heat exchangers with groundwater advection
2012 (engelsk)Konferansepaper, Poster (with or without abstract) (Annet vitenskapelig)
HSV kategori
Identifikatorer
urn:nbn:se:ltu:diva-29780 (URN)35e104ac-e401-4321-9e45-02510371106d (Lokal ID)35e104ac-e401-4321-9e45-02510371106d (Arkivnummer)35e104ac-e401-4321-9e45-02510371106d (OAI)
Konferanse
European Geothermal PhD day : 29/03/2012 - 29/03/2012
Merknad
Upprättat; 2012; 20120824 (albliu)Tilgjengelig fra: 2016-09-30 Laget: 2016-09-30 Sist oppdatert: 2017-11-25bibliografisk kontrollert
Piller, M. & Scorpo, A. L. (2012). Numerical investigation of ground-coupled, vertical borehole heat exchangers with groundwater advection (ed.). Paper presented at . Heat Transfer Research, 43(4), 343-362
Åpne denne publikasjonen i ny fane eller vindu >>Numerical investigation of ground-coupled, vertical borehole heat exchangers with groundwater advection
2012 (engelsk)Inngår i: Heat Transfer Research, ISSN 1064-2285, E-ISSN 2162-6561, Vol. 43, nr 4, s. 343-362Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Groundwater advection is commonly neglected in the design of ground-coupled, vertical borehole heat exchangers. In this work, the efficiency of heat transfer from a vertical borehole with groundwater advection is investigated by numerical simulations. The actual borehole geometry is accounted for, resulting in a perturbed flow field. The present results are compared with the analytical solution for the transient, two-dimensional heat convection around a line heat source derived by Diao et al. (2004). A wide range of viable Peclet numbers is considered.

HSV kategori
Identifikatorer
urn:nbn:se:ltu:diva-4959 (URN)10.1615/HeatTransRes.2012004565 (DOI)2f74e4a5-4aee-4a6d-b7f7-046893aeb82e (Lokal ID)2f74e4a5-4aee-4a6d-b7f7-046893aeb82e (Arkivnummer)2f74e4a5-4aee-4a6d-b7f7-046893aeb82e (OAI)
Merknad
Upprättat; 2012; 20120823 (albliu)Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2017-11-24bibliografisk kontrollert
Perri, M. T., Cassiani, G., Deiana, R., Fabbri, P., Scorpo, A. L. & Ortombina, M. (2010). Monitoraggio ERT ed EM di un test con tracciante in un acquifero di risorgiva (ed.). Paper presented at Convegno nazionale GNGTS : 26/10/2010 - 28/10/2010. Paper presented at Convegno nazionale GNGTS : 26/10/2010 - 28/10/2010.
Åpne denne publikasjonen i ny fane eller vindu >>Monitoraggio ERT ed EM di un test con tracciante in un acquifero di risorgiva
Vise andre…
2010 (italiensk)Konferansepaper, Oral presentation only (Annet vitenskapelig)
Identifikatorer
urn:nbn:se:ltu:diva-38520 (URN)cf2fb9fc-caa1-4b1d-bf25-a5c8cae0c424 (Lokal ID)cf2fb9fc-caa1-4b1d-bf25-a5c8cae0c424 (Arkivnummer)cf2fb9fc-caa1-4b1d-bf25-a5c8cae0c424 (OAI)
Konferanse
Convegno nazionale GNGTS : 26/10/2010 - 28/10/2010
Merknad
Upprättat; 2010; 20120824 (albliu)Tilgjengelig fra: 2016-10-03 Laget: 2016-10-03 Sist oppdatert: 2017-11-25bibliografisk kontrollert
Organisasjoner