Change search
Link to record
Permanent link

Direct link
BETA
Publications (10 of 31) Show all publications
Johansson, T., Hartmann, T., Jongeling, R. & Olofsson, T. (2012). Development of 4D public participation GIS to improve communication of city transformation processes (ed.). In: (Ed.), Hubo Cai (Ed.), Construction Research Congress 2012: Construction challenges in a flat world : proceedings of the 2012 Construction Research Congress, May 21-23, 2012, West Lafayette, Indiana. Paper presented at Construction Research Congress : 21/05/2012 - 23/05/2012 (pp. 1242-1251). Reaston, Va.: American Society of Civil Engineers (ASCE)
Open this publication in new window or tab >>Development of 4D public participation GIS to improve communication of city transformation processes
2012 (English)In: Construction Research Congress 2012: Construction challenges in a flat world : proceedings of the 2012 Construction Research Congress, May 21-23, 2012, West Lafayette, Indiana / [ed] Hubo Cai, Reaston, Va.: American Society of Civil Engineers (ASCE), 2012, p. 1242-1251Conference paper, Published paper (Refereed)
Abstract [en]

Based on a case study of the city transformation of Kiruna we concluded that the information about the urban planning processes; (1) was scattered and hard to understand and (2) not communicated properly for the public to be able to participate. Here public participation geographical systems (PPGIS) and modeling of a project delivery timeline, also known as 4D, are possibilities to improve communication with stakeholders in urban planning and construction processes. As a result, we set up three requirements for the development of a 4D PPGIS communication platform. Firstly, time-space urban planning information must be available and understandable for the citizens to comprehend. Secondly, the communication platform must support two-way asynchronous communication for collecting public opinions and proposals. Finally, the user interface, operations and management of the platform must engage citizens to participate in the urban planning process. An experimental 4D PPGIS based on Google Earth and Facebook services was developed to visualize geo-referenced past, current and future urban activities and support public discussions regarding planning proposals. The prototype is currently being evaluated in the first iterative cycle of the information system development method

Place, publisher, year, edition, pages
Reaston, Va.: American Society of Civil Engineers (ASCE), 2012
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-38832 (URN)10.1061/9780784412329.125 (DOI)2-s2.0-84866252971 (Scopus ID)d589e2f1-c496-467d-b0fb-062c96c23fa7 (Local ID)9780784412329 (ISBN)d589e2f1-c496-467d-b0fb-062c96c23fa7 (Archive number)d589e2f1-c496-467d-b0fb-062c96c23fa7 (OAI)
Conference
Construction Research Congress : 21/05/2012 - 23/05/2012
Note
Godkänd; 2012; 20120926 (andbra)Available from: 2016-10-03 Created: 2016-10-03 Last updated: 2018-07-10Bibliographically approved
Johansson, T. & Jongeling, R. (2011). A communication platform to support decision making in Kiruna city relocation process (ed.). In: (Ed.), Timo Hartmann; Pieter de Wilde; Yaqub Rafiq (Ed.), Proceedings of the 2011 eg-ice Workshop: . Paper presented at Workshop of the European Group for Intelligent Computing in Engineering : 06/07/2011 - 08/07/2011. Twente: University of Twente
Open this publication in new window or tab >>A communication platform to support decision making in Kiruna city relocation process
2011 (English)In: Proceedings of the 2011 eg-ice Workshop / [ed] Timo Hartmann; Pieter de Wilde; Yaqub Rafiq, Twente: University of Twente , 2011Conference paper, Published paper (Other academic)
Abstract [en]

The city of Kiruna in Sweden needs to be relocated due to mining related subsidence which is affecting major parts of the urban environment. Using 4D modelling environment for visualisation of urban planning can support the communication and decision making between the different stakeholders. This paper identifies principles from the definition of wicked problem and rational decision making theory in order to create a communication platform to support the city relocation process. A combined approach consisting of Google Earth for visualisation of 4D plans combined with social networks for enhanced communication and participatory urban planning is suggested to be the main ingredients of the communication platform.

Place, publisher, year, edition, pages
Twente: University of Twente, 2011
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-39672 (URN)e82d7f75-95d6-46b1-80b9-7fc92ace2596 (Local ID)978-90-365-3216-7 (ISBN)e82d7f75-95d6-46b1-80b9-7fc92ace2596 (Archive number)e82d7f75-95d6-46b1-80b9-7fc92ace2596 (OAI)
Conference
Workshop of the European Group for Intelligent Computing in Engineering : 06/07/2011 - 08/07/2011
Note
Godkänd; 2011; 20111016 (ysko)Available from: 2016-10-03 Created: 2016-10-03 Last updated: 2018-06-08Bibliographically approved
Norberg, H. & Jongeling, R. (2008). A model-based production planning and control method supporting delivery of cast-in-place concrete (ed.). Paper presented at International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008. Paper presented at International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008.
Open this publication in new window or tab >>A model-based production planning and control method supporting delivery of cast-in-place concrete
2008 (English)Conference paper, Oral presentation only (Refereed)
Abstract [en]

This paper combines model-based design and construction techniques with principles from location based planning methods. Both concepts are applied in a practical study in which a model-based method is developed for the planning and control of cast in place concrete deliveries to the building site. The overall aim of this paper is to show a method that can be used to make the planning and control of the delivery process for cast in place concrete more efficient. The paper shows examples of changes in the way the concrete delivery process is handled by different actors. Using model-based working methods allow users to have better control of how for example material properties, such as concrete drying time, affect the planning and control of the delivery process. The paper first provides a background of the research including a description of the case study project. This section is followed by a description of the various methods and systems used in the case study. The application of the method is discussed, based on interviews with both a ready-mixed concrete supplier and a contractor that took part in the case study. The paper is concluded with suggestions for how the method can be further developed and improved to support the scheduling and control of cast in place concrete delivery.

National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-30564 (URN)46a6a9d0-bafe-11dd-b223-000ea68e967b (Local ID)46a6a9d0-bafe-11dd-b223-000ea68e967b (Archive number)46a6a9d0-bafe-11dd-b223-000ea68e967b (OAI)
Conference
International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008
Note
Godkänd; 2008; Bibliografisk uppgift: Værtspublikationsredaktører: N. Dawood; 20081125 (haknor)Available from: 2016-09-30 Created: 2016-09-30 Last updated: 2018-06-08Bibliographically approved
Jongeling, R. (2008). BIM istället för 2D-CAD i byggprojekt: en jämförelse mellan dagens byggprocesser baserade på 2D-CAD och tillämpningar av BIM (ed.). Paper presented at . Luleå: Luleå tekniska universitet
Open this publication in new window or tab >>BIM istället för 2D-CAD i byggprojekt: en jämförelse mellan dagens byggprocesser baserade på 2D-CAD och tillämpningar av BIM
2008 (Swedish)Report (Other academic)
Abstract [sv]

Denna rapport redovisar resultat av en jämförelse mellan användandet av Byggnadsinformationsmodeller (BIM) och 2D-CAD i byggprojekt. Syftet är att skapa ett beslutsunderlag för aktörer i byggbranschen genom att lyfta fram exempel på fördelar och vinster med tillämpningar av BIM i form av tid, kvalitet, ekonomi. Studien har med hjälp av intervjuer med aktörer i ett 5- tal byggprojekt identifierat nyttan i ett antal delprocesser: Underlag som tas fram under projekteringsprocessen har konsekvent högre till mycket högre kvalitet, är tydligare och mer integrerat. Projekteringsprocessen är i snitt 20% effektivare och upplevs dessutom som mer inspirerande och attraktiv jämfört med 2D-CAD-projektering. 3D-visualisering som stöd för beslutsprocessen anses av beslutsfattare som kommit i kontakt med BIM en förutsättning och en självklarhet i deras arbete. Kommunikation är tydligare och besluts- och försäljningsprocessen snabbare och enklare. Eftersom 3D-visualisering är en biprodukt av BIM- projektering är den kostnadseffektivt och direkt tillgängligt för användaren. Kostnader för interaktiv visualisering minskar med 30% om projekteringen görs med hjälp av BIM. Samordningsprocessen är mycket effektivare, kvalitén högre och resulterar i snabbare revideringsprocessen. Färre missförstånd uppstår och fler aktörer kan vara delaktiga. Teknikkonsulter uppskattar att samordningsfel minskar med minst 50%. Kvalitén på mängdavtagningsprocessen är högre och tiden för mängdavtagningen och kostnadskalkyler minskar med omkring 50%. Teknikkonsulter påstår att de nu genomför fler analyser än vad de har gjort vid projektering i 2D, eftersom analyser är enklare och snabbare att genomföra. Analyserna bygger på ett mer exakt underlag från BIM-modellen jämfört med användningen av generella nyckeltal och antaganden. Teknikkonsulter och beställare är övertygade om att det bidrar till kvalitén av slutprodukten. Tillämpning av BIM under planering och produktion leder till enklare och snabbare kommunikationsprocesser mellan de olika aktörerna på arbetsplatsen. Underlaget från projekteringen anses vara av mycket högre kvalitet än i vanliga fall. Produktionen flyter bättre bland annat på grund av färre fel i underlaget. Entreprenörer som intervjuats uppskattar att kostnader för ändrings- och tilläggsarbeten minskar med ca 50%. Areahantering med hjälp av BIM för beställare och förvaltare blir effektivare. Användaren kan snabbt och enkelt ta fram area-information med tydlig representation; ett arbete som annars hade tagit för mycket tid. Relationen mellan olika typer av information och integrationen av informationen blir bättre när fler användare har tillgång till samma information. Nyttan med BIM-användning kvantifieras med hjälp av ett räkneexempel. Exemplet, som grundar sig på uttalande och uppskattningar från intervjuade aktörer, visar att det finns vinster för alla aktörer i projekt där BIM används. En konservativ uppskattning är att minst 4% av byggkostnader kan sparas. Nettobesparingen för arkitekter och teknikkonsulter är 0 - 20% och för entreprenören 4%. Exemplet utgår från en oförändrad process där många potentiella besparingar inte har tagits med. Exemplet visar att BIM- teknologin redan kan ge en relativ stor effekt vid en begränsad tillämpning av BIM. Den potentiella nyttoeffekten av BIM är med stor sannolikhet mycket större. Studien har inte kunnat få fram underlag för att kunna göra en säker kvantitativ uppskattning av nyttan för beställaren och förvaltare. Istället har ett räkneexempel används där nyttan har beräknas utifrån ett livscykelperspektiv. Min rekommendation är att framtida studier bör genomföras som fokuserar på nyttoeffekterna ur byggherrens och förvaltarens perspektiv. Vidare behövs det fler studier för att ta fram parametrar som mäter processutvecklingen. Utan objektiva mätningar är det mycket svårt att driva utvecklingsarbete av en BIM-driven byggprocess. Andra typer av rutiner och processer behöver tas fram för hantering av information i byggprocessen. Även rollen för en modellmanager och en Information Delivery Manual (IDM) bör utvecklas för att koordinera informationshanteringen i processerna. Nyttoeffekter från BIM-tillämpningar i mark- och anläggningsprojekt bör lyftas fram.

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet, 2008. p. 39
Series
Research report / Luleå University of Technology, ISSN 1402-1528 ; 2008:04
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-25222 (URN)e4413c30-ef68-11dc-a549-000ea68e967b (Local ID)e4413c30-ef68-11dc-a549-000ea68e967b (Archive number)e4413c30-ef68-11dc-a549-000ea68e967b (OAI)
Note
Godkänd; 2008; 20080311 (ysko)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-06-08Bibliographically approved
Jongeling, R. (2008). BIM istället för 2D-CAD i bygprojekt (ed.). Paper presented at . V-byggaren : väg- och vattenbyggaren (2), 32-34
Open this publication in new window or tab >>BIM istället för 2D-CAD i bygprojekt
2008 (Swedish)In: V-byggaren : väg- och vattenbyggaren, ISSN 0283-5363, no 2, p. 32-34Article in journal (Other academic) Published
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-7005 (URN)55665e50-fe94-11dd-95be-000ea68e967b (Local ID)55665e50-fe94-11dd-95be-000ea68e967b (Archive number)55665e50-fe94-11dd-95be-000ea68e967b (OAI)
Note
Godkänd; 2008; 20090219 (andbra)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-06-08Bibliographically approved
Jongeling, R., Kimb, J., Fischer, M., Mourgues, C. & Olofsson, T. (2008). Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models (ed.). Paper presented at . Automation in Construction, 17(6), 780-791
Open this publication in new window or tab >>Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
Show others...
2008 (English)In: Automation in Construction, ISSN 0926-5805, E-ISSN 1872-7891, Vol. 17, no 6, p. 780-791Article in journal (Refereed) Published
Abstract [en]

This paper presents time-space analyses of construction operations supported by quantitative information extracted from 4D CAD models. The application of 4D models is a promising approach to help introduce construction innovations and to evaluate construction alternatives. Current analyses of 4D models are mainly visual and provide project stakeholders with a clear, but limited, insight of construction planning information. This practice does not take advantage of the quantitative data contained in 4D models. We use two 4D models of an industry test case to illustrate how to analyze, compare, and present 4D content quantitatively (i.e., workspace areas, work locations, and distances between concurrent activities). This paper shows how different types of 4D content can be extracted from 4D models to support 4D-content-based analyses and novel presentation of construction planning information. We suggest further research aimed at formalizing the contents in 4D models to enable comparative quantitative analyses of construction planning alternatives. Formalized 4D content can enable the development of reasoning mechanisms that automate 4D-model-based analyses and provide the data content for presentations of construction planning information.

Abstract [en]

This paper presents time-space analyses of construction operations supported by quantitative information extracted from 4D CAD models. The application of 4D models is a promising approach to help introduce construction innovations and to evaluate construction alternatives. Current analyses of 4D models are mainly visual and provide project stakeholders with a clear, but limited, insight of construction planning information. This practice does not take advantage of the quantitative data contained in 4D models. We use two 4D models of an industry test case to illustrate how to analyze, compare, and present 4D content quantitatively (i.e., workspace areas, work locations, and distances between concurrent activities). This paper shows how different types of 4D content can be extracted from 4D models to support 4D-content-based analyses and novel presentation of construction planning information. We suggest further research aimed at formalizing the contents in 4D models to enable comparative quantitative analyses of construction planning alternatives. Formalized 4D content can enable the development of reasoning mechanisms that automate 4D-model-based analyses and provide the data content for presentations of construction planning information. Udgivelsesdato: August

National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-6845 (URN)10.1016/j.autcon.2008.02.006 (DOI)000256159900012 ()2-s2.0-41749088228 (Scopus ID)5263d2a0-0d63-11dd-9b51-000ea68e967b (Local ID)5263d2a0-0d63-11dd-9b51-000ea68e967b (Archive number)5263d2a0-0d63-11dd-9b51-000ea68e967b (OAI)
Note
Validerad; 2008; 20080418 (rogier)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-07-10Bibliographically approved
Jongeling, R. & Olofsson, T. (2008). The VIPP project: results from a case study of the practical application of 3D- and 4D-modelling techniques in design and construction (ed.). Paper presented at International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008. Paper presented at International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008.
Open this publication in new window or tab >>The VIPP project: results from a case study of the practical application of 3D- and 4D-modelling techniques in design and construction
2008 (English)Conference paper, Oral presentation only (Refereed)
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-33975 (URN)8112ca20-c77b-11dd-941d-000ea68e967b (Local ID)8112ca20-c77b-11dd-941d-000ea68e967b (Archive number)8112ca20-c77b-11dd-941d-000ea68e967b (OAI)
Conference
International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008
Note
Godkänd; 2008; Bibliografisk uppgift: Værtspublikationsredaktører: N. Dawood; 20081211 (ysko)Available from: 2016-09-30 Created: 2016-09-30 Last updated: 2018-06-08Bibliographically approved
Jongeling, R. & Olofsson, T. (2007). A method for planning of work-flow by combined use of location-based scheduling and 4D CAD (ed.). Paper presented at . Automation in Construction, 16(2), 189-198
Open this publication in new window or tab >>A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
2007 (English)In: Automation in Construction, ISSN 0926-5805, E-ISSN 1872-7891, Vol. 16, no 2, p. 189-198Article in journal (Refereed) Published
Abstract [en]

There is a great potential to improve the flow of resources through locations on construction sites, termed work-flow. Current activity-based scheduling techniques do not provide adequate support for the planning of work-flow due to practical and methodological reasons. Location-based scheduling techniques provide a promising alternative to activity-based scheduling techniques for planning of work-flow. However, neither location-based nor activity-based scheduling techniques provide users with insight in the spatial configuration of scheduled construction operations. A technique that can provide this insight is 4D CAD in which 3D CAD models are combined with data from construction schedules. This article presents a process method for the planning of work-flow by combined use of location-based scheduling and 4D CAD. We suggest that a location-based approach to 4D CAD can improve the usability of the 4D CAD models for work-flow analyses. In addition, the article suggests that 4D CAD can enhance the value of location-based schedules.

National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-12933 (URN)10.1016/j.autcon.2006.04.001 (DOI)000242815100006 ()2-s2.0-33846023352 (Scopus ID)c14d0e00-8a9e-11db-8975-000ea68e967b (Local ID)c14d0e00-8a9e-11db-8975-000ea68e967b (Archive number)c14d0e00-8a9e-11db-8975-000ea68e967b (OAI)
Note
Validerad; 2007; 20061122 (ysko)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-07-10Bibliographically approved
Björnfot, A. & Jongeling, R. (2007). Application of line-of-balance and 4D CAD for lean planning (ed.). Paper presented at . Construction Innovation, 7(2), 200-211
Open this publication in new window or tab >>Application of line-of-balance and 4D CAD for lean planning
2007 (English)In: Construction Innovation, ISSN 1471-4175, E-ISSN 1477-0857, Vol. 7, no 2, p. 200-211Article in journal (Refereed) Published
Abstract [en]

Purpose - The purpose of this paper is to suggest the application of the line-of-balance (LoB) scheduling technique in combination with a 4D CAD workspace model as a method to improve the management of the flow of resources through locations in construction projects, defined as work flow. Current scheduling methods fail to consistently manage work flow, which can disrupt the construction process, leading to waste such as conflicts in time and space by construction crews. Design/methodology/approach - LoB and 4D CAD are applied to a case study of multi-story timber housing project involving the construction of 95 apartments in five six-storey buildings. Based on the case study results, the benefits and limitations of the combined use of both methods are discussed. Findings - The majority of the problems experienced during the actual construction process quickly become evident from an analysis of a relatively simple LoB diagram. Furthermore, the 4D CAD workspace model provides additional insights in the scheduling of construction activities, such as workspace availability, the spatial context of workspaces and partial overlap of workspaces. Practical implications - Virtual design and construction methods based on principles from lean construction can contribute significantly to the value of the product and the elimination of waste in any construction project. Originality/value - The paper refers to the guiding principles from lean construction in relation to virtual design and construction methods, such as simulations with 4D CAD. Additional research and studies of practical applications are suggested to facilitate the combination of principles from lean construction with virtual design and construction methods.

National Category
Building Technologies Construction Management
Research subject
Timber Structures; Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-9287 (URN)10.1108/14714170710738559 (DOI)2-s2.0-84986078111 (Scopus ID)7e0033b0-7725-11dc-80da-000ea68e967b (Local ID)7e0033b0-7725-11dc-80da-000ea68e967b (Archive number)7e0033b0-7725-11dc-80da-000ea68e967b (OAI)
Note
Validerad; 2007; 20071010 (anbjo)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-07-10Bibliographically approved
Olofsson, T., Toolanen, B., Jongeling, R., Woksepp, S. & Simu, K. (2007). Byggande av kulsinteranläggning MK3: processdesign, samverkansformer och IT-stöd (ed.). Paper presented at . Luleå: Luleå tekniska universitet
Open this publication in new window or tab >>Byggande av kulsinteranläggning MK3: processdesign, samverkansformer och IT-stöd
Show others...
2007 (Swedish)Report (Other academic)
Abstract [sv]

Denna rapport beskriver de studier som en grupp av forskare vid Institutionen för Samhällsbyggnad, Luleå tekniska universitet, genomfört beträffande vissa centrala delar av projektupplägget vid byggandet av kulsinteranläggning MK3 vid LKAB:s anläggningar i Vitåfors under perioden Nov. 2004 till Dec. 2006. Vid tidpunkten för investeringsbeslutet för kulsinterverket MK3, som är det första i en rad av planerade stora investeringar, var LKAB i en situation där man hade dragit ner egna projekterings- och projektledningsresurser efter att ha genomfört stora investeringar under 1990-talet. I det läget var det en strategiskt viktig beslutsfråga för företagsledning och styrelse hur MK3 projektet skulle styras och organiseras för att säkerställa projektets höga målsättningar beträffande tid, funktion och ekonomi. Dessutom är projekt av typen MK3 ofta dynamiska till sin natur (kort ledtid, snabba informations- och kommunikationsbehov), tekniskt och administrativt komplexa och med många risker och osäkerhetsfaktorer som måste hanteras kontinuerligt under projekttiden. LKAB har för projekt MK3 valt att söka samverkanslösningar för att med be- gränsade egna resurser kunna följa upp och påverka projektets funktionsut- formning, tid för genomförande samt projektets investeringskostnader. Sålunda har byggdelen av MK 3 upphandlats med transparent ersättningsform och strukturerad samverkansform, typ partnering. Genomförandeformen är totalentreprenad (ABT 94) där byggentreprenören administrativt ansvarar för detaljprojekteringen. Till huvudentreprenör på byggdelen och med samordningsansvar även för installationsfasen av separat upphandlade processdelar har valts NCC. Enligt de resultat från genomförda studier som redovisas i denna rapport anser en stor majoritet av i projekt MK3 medverkande beställar-, entreprenörs- och konsultrepresentanter att valet av upphandlingsmodell med klar samverkansprofil för projektet varit lyckad. En majoritet anser också att detta varit av avgörande betydelse för att kunna nå projektets målsättningar beträffande funktion, tid och ekonomi. Bland de fördelar som upphandlingsmodellen medfört är att samarbetsklimatet mellan aktörerna upplevts som bättre än vid konventionellt upphandlade projekt. Detta har ett egenvärde i sig men är framförallt en nödvändig förutsättning för att kunna nyttja strategiska viktiga kompetenser och kunskaper på ett effektivt sätt för att projektets målsättningar skall säkerställas. Effekterna av det goda samarbetsklimatet är speciellt tydliga i det sätt projekteringen av anläggningen kunnat bedrivas i effektiv samverkan mellan kund, entreprenör och konsulter (Concurrent engineering). Vid projektgenomförandet har även De IT-stödsystem, speciellt 3D modellering och VR använts på innovativt sätt som kommunikations- och informationsverktyg. Användandet av detta i projekteringen har på många sätt bidragit till att skapa mervärde för kunden och minska byggfelen i produktionen. Enbart besparingarna i en effektivare projektsamordning torde ha bekostat investeringen i 3D och VR med råge.

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet, 2007. p. 71
Series
Technical report / Luleå University of Technology, ISSN 1402-1536 ; 2007:05
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
urn:nbn:se:ltu:diva-24443 (URN)b00c0550-0925-11dc-9854-000ea68e967b (Local ID)b00c0550-0925-11dc-9854-000ea68e967b (Archive number)b00c0550-0925-11dc-9854-000ea68e967b (OAI)
Note
Godkänd; 2007; 20070523 (ysko)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-06-08Bibliographically approved
Organisations
Identifiers
ORCID iD: ORCID iD iconorcid.org/0000-0003-0808-9268

Search in DiVA

Show all publications