Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Development of the Lillpite River Valley after Dam Removal
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Arkitektur och vatten. Lillpite älvdals ekonomiska förening.ORCID-id: 0000-0001-7144-9778
Lillpite älvdals ekonomiska förening.
Lillpite älvdals ekonomiska förening.
2018 (engelsk)Konferansepaper (Annet (populærvitenskap, debatt, mm))
Abstract [en]

The Lillpite River Valley stretches 45 km NV, from Piteå at the Gulf of Bothnia. The 619 km2 large catchment area comprises a dozen lakes. The average flow rate of the river is 6.24 m3/s. Lillpite Kraft AB, which owns the two power plants in the Lillpite River, has now applied for a demolition permit after 30 years of unprofitable operation. This demolition will take place in 2020, after which there are no obstacles to the fish's migration in the river. The Lillpite River was famous for its large salmon but also for its trout, grayling and lamprey. River crayfish and freshwater pearl mussel exist in the river, both upstream and downstream of the two dams, and in the brooks. There are even eel and pikeperch in the river, which also hosts beaver and otter. The Lillpite River Economic Association manages the compensation (~30M€ over 50 years) for the wind power intrusion in the area. This organisation is committed to make the river the fishing water it once was, as a driving force for the development of the river valley. At this seminar, we seek your help and advice based on knowledge and experience. How to determine the river status before and after dam removal? River erosion? Timeline after dam removal? Evaluation of ecology and biodiversity? How to improve conditions for fish, crustaceans and pearl mussel? How to meet sceptical locals? What should/could we do before the dam removal?

sted, utgiver, år, opplag, sider
2018.
HSV kategori
Forskningsprogram
VA-teknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-70161OAI: oai:DiVA.org:ltu-70161DiVA, id: diva2:1235414
Konferanse
International Seminar on Dam Removal, Hudiksvall, Sweden, 24-26 September 2018
Tilgjengelig fra: 2018-07-25 Laget: 2018-07-25 Sist oppdatert: 2018-09-21bibliografisk kontrollert

Open Access i DiVA

fulltext(1479 kB)228 nedlastinger
Filinformasjon
Fil FULLTEXT02.pdfFilstørrelse 1479 kBChecksum SHA-512
16a0a1e7c3a839415542522bab1519bd18b38b7fdd32f3af847e02fc17605fc269f53d6e1de6f3b4433054bd721051407eb4078708b37b19378d27d7fb0cc83c
Type fulltextMimetype application/pdf

Andre lenker

http://www.nrrv.se/2018/06/international-seminar-dam-removal/

Person

Nordell, Bo

Søk i DiVA

Av forfatter/redaktør
Nordell, Bo
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 233 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 544 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf