Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A model-based production planning and control method supporting delivery of cast-in-place concrete
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Byggkonstruktion och -produktion.
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Byggkonstruktion och -produktion.ORCID-id: 0000-0003-0808-9268
2008 (engelsk)Konferansepaper, Oral presentation only (Fagfellevurdert)
Abstract [en]

This paper combines model-based design and construction techniques with principles from location based planning methods. Both concepts are applied in a practical study in which a model-based method is developed for the planning and control of cast in place concrete deliveries to the building site. The overall aim of this paper is to show a method that can be used to make the planning and control of the delivery process for cast in place concrete more efficient. The paper shows examples of changes in the way the concrete delivery process is handled by different actors. Using model-based working methods allow users to have better control of how for example material properties, such as concrete drying time, affect the planning and control of the delivery process. The paper first provides a background of the research including a description of the case study project. This section is followed by a description of the various methods and systems used in the case study. The application of the method is discussed, based on interviews with both a ready-mixed concrete supplier and a contractor that took part in the case study. The paper is concluded with suggestions for how the method can be further developed and improved to support the scheduling and control of cast in place concrete delivery.

sted, utgiver, år, opplag, sider
2008.
HSV kategori
Forskningsprogram
Byggproduktion
Identifikatorer
URN: urn:nbn:se:ltu:diva-30564Lokal ID: 46a6a9d0-bafe-11dd-b223-000ea68e967bOAI: oai:DiVA.org:ltu-30564DiVA, id: diva2:1003792
Konferanse
International Conference on Construction Application of Virtual Reality : 20/10/2008 - 21/10/2008
Merknad
Godkänd; 2008; Bibliografisk uppgift: Værtspublikationsredaktører: N. Dawood; 20081125 (haknor)Tilgjengelig fra: 2016-09-30 Laget: 2016-09-30 Sist oppdatert: 2018-06-08bibliografisk kontrollert

Open Access i DiVA

fulltekst(591 kB)384 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 591 kBChecksum SHA-512
a3b4adfeae3d7cdbce79374a943cf8d904e1b8a6d236d7cdddc7c197883f6d73aba79968dbf0bd7d3b83b344375b4d04f4b8610d03ac254a0587a4936b95ab8d
Type fulltextMimetype application/pdf

Personposter BETA

Norberg, HåkanJongeling, Rogier

Søk i DiVA

Av forfatter/redaktør
Norberg, HåkanJongeling, Rogier
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 384 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 74 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf