Managing the tensions between exploration and exploitation in large construction projects
Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle, Innovation och Design.ORCID-id: 0000-0002-1746-2637
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Industriellt och hållbart byggande.
2017 (engelsk)Inngår i: Construction Innovation, ISSN 1471-4175, E-ISSN 1477-0857, Vol. 17, nr 4, s. 492-510Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Purpose – Prior studies highlight the importance of building ambidextrous capabilities to achieve both exploitation of current knowledge and technologies to make profits today, and exploration of new knowledge and technologies to adapt to and prepare for tomorrow's demands. In spite of its theoretical and practical importance, research on organizational ambidexterity in project-based organizations is scarce. Thus, the purpose of the paper is to study how ambidexterity may be managed and how exploration and exploitation may be achieved in construction projects. The research identifies some drivers and barriers to exploration and exploitation and also sheds light on how various management approaches interact and affect exploration and exploitation activities. Design/methodology/approach – The empirical material is drawn from 40 semi-structured interviews with managers representing the client, the contractor and the designer involved in each of the seven large construction projects in the sample. Findings – In contrast to prior literature in high-tech industries where exploitation focuses on continuous development, exploitation in construction projects often involves adopting conventional methods and solutions based on existing knowledge without any development efforts at all. This may enhance short-term efficiency and lower risk at the project level but increase risk at the firm level. Tight time schedules hinder both radical innovations and incremental developments, and the findings also reveal that to invest in efforts on explorative solutions, it must be possible to exploit the solutions in the same project. Research limitations/implications – In this empirical context, the traditional structural and sequential ambidexterity solutions are not sufficient. In construction projects, contextual ambidexterity solutions in which key project actors collaborate in developing systemic innovations and fine-tuning solutions across projects are more effective. Practical implications – Sufficient project size and/or long-term contracts over a series of projects enhance both investments in explorative activities and exploitation through continuous developments from project to project. In design-bid-build contracts, the client and consultant often miss opportunities to explore new technical solutions that rely on contractor competencies. Early procurement of contractors (e.g. in collaborative design-build contracts) thereby enables the achievement of both exploration and exploitation. Originality/value – This study provides important input to the authors' understanding of how exploration and exploitation may be managed in project-based industries, which has been scarcely studied in previous ambidexterity literature.

sted, utgiver, år, opplag, sider
Emerald Group Publishing Limited, 2017. Vol. 17, nr 4, s. 492-510
HSV kategori
Forskningsprogram
Entreprenörskap och innovation; Byggproduktion
Identifikatorer
URN: urn:nbn:se:ltu:diva-66815DOI: 10.1108/CI-05-2016-0032ISI: 000415630600005Scopus ID: 2-s2.0-85032947736OAI: oai:DiVA.org:ltu-66815DiVA, id: diva2:1161048
Merknad

Validerad;2017;Nivå 2;2017-11-29 (svasva)

Tilgjengelig fra: 2017-11-29 Laget: 2017-11-29 Sist oppdatert: 2017-12-12bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fulltekstScopus

Søk i DiVA

Av forfatter/redaktør
Eriksson, Per-ErikSzentes, Henrik
Av organisasjonen
I samme tidsskrift
Construction Innovation

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 84 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf