Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Integrating mining loading and hauling equipment selection and replacement decisions using stochastic linear programming
Department of Mining Engineering, Pontificia Universidad Católica de Chile, Santiago.
Pontificia Universidad Católica de Chile, Department of Mining Engineering, Pontificia Universidad Católica de Chile, Santiago.
Department of Engineering Sciences, Universidad Andres Bello, Santiago.
Department of Industrial Engineering, Pontificia Universidad Católica de Chile, Santiago.
Vise andre og tillknytning
Rekke forfattare: 52017 (engelsk)Inngår i: International Journal of Mining, Reclamation and Environment, ISSN 1748-0930, E-ISSN 1748-0949, Vol. 31, nr 1, s. 52-65Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Equipment selection is a key strategic decision in the design of a material handling system, because an improper one will lead to operational problems and unnecessary investment costs. It involves determining the number and combination of loaders and trucks which will move the material, fulfilling a specified production schedule. Previous works have addressed this problem with deterministic approaches, without considering the inter-dependent availability of trucks and loaders. In order to fill this gap, we developed a stochastic model that combines the selection and equipment replacement problems, subject to a stochastic production rate constraint. This is a new idea that will help decision-makers to decide faster and more reliable. The proposed model optimises the fleet by minimising the total life cycle costs. To solve it, we used a linearisation approach that reduces the computational effort. We tested our approach with a benchmark model, using a mining case study. Results indicate that the solutions ensure with a high probability a determined production target, producing good robust solutions compared to the deterministic counterpart.

sted, utgiver, år, opplag, sider
Taylor & Francis, 2017. Vol. 31, nr 1, s. 52-65
HSV kategori
Forskningsprogram
Drift och underhållsteknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-5660DOI: 10.1080/17480930.2015.1115589ISI: 000392223100004Scopus ID: 2-s2.0-84949184007Lokal ID: 3d33d2ed-31c0-4bdb-9c4b-f8e0e0e02d9dOAI: oai:DiVA.org:ltu-5660DiVA, id: diva2:978534
Merknad

Validerad; 2017; Nivå 2; 2017-01-17 (andbra)

Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2018-11-15bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fulltekstScopus

Person

Galar, Diego

Søk i DiVA

Av forfatter/redaktør
Galar, Diego
Av organisasjonen
I samme tidsskrift
International Journal of Mining, Reclamation and Environment

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 483 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf