Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Role of ferrous raw materials in the energy efficiency of integrated steelmaking
Oulun Yliopisto, Laboratory of Process Metallurgy, Oulu.
Swerea MEFOS AB.
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Mineralteknik och metallurgi.
2014 (svensk)Inngår i: ISIJ International, ISSN 0915-1559, E-ISSN 1347-5460, Vol. 54, nr 3, s. 596-604Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

The role of ferrous raw materials and iron ore agglomeration in energy consumption of integrated steelmaking has been evaluated using a system-wide model. Four steelplant cases were defined: typical European steelplant with sinterplant; Nordic steelplant with sinterplant; European steelplant with sinter:pellet ratio of 50%, and Nordic steelplant charging pellets and a small amount of briquettes. Energy consumption in the mining system were estimated from published statistics at 150 MJ/t for lump ore and sinter fines, 650 MJ/t for pellets made from magnetite and 1 050 MJ/t for pellets made from hematite. An integrated steelplant model including all major unit operations was used to calculate overall system energy consumption from iron ore mining to hot rolled coil. Adjustments were made accounting for energy benefit of ground granulated blast furnace slag in cement production, energy required for cement production required for briquetting, and excess BF and BOF gas producing electricity in a 32% efficient power plant. The system-wide net adjusted energy in the first three steeplant cases showed marginal improvement with use of high grade sinter fines and decrease of pellet/sinter ratio to 50% compared to typical European case. Nordic steelplant charging pellets and briquettes had a reduction in system-wide energy of 5% to 8% for charging pellets from hematite or magnetite respectively compared to the typical European steelplant charging sinter and pellets made from hematite ore. Replacement of sinter with pellets was mainly responsible for the improvement with smaller contributions from magnetite ore in pelletizing.

sted, utgiver, år, opplag, sider
2014. Vol. 54, nr 3, s. 596-604
HSV kategori
Forskningsprogram
Processmetallurgi
Identifikatorer
URN: urn:nbn:se:ltu:diva-8484DOI: 10.2355/isijinternational.54.596ISI: 000333509300019Scopus ID: 2-s2.0-84898020762Lokal ID: 6ff1fa2e-df20-4d35-a537-277b6e759532OAI: oai:DiVA.org:ltu-8484DiVA, id: diva2:981422
Merknad

Validerad; 2014; 20140429 (johsod)

Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2018-07-10bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fulltekstScopus

Personposter BETA

Wikström, Jan-OlovBjörkman, Bo

Søk i DiVA

Av forfatter/redaktør
Wikström, Jan-OlovBjörkman, Bo
Av organisasjonen
I samme tidsskrift
ISIJ International

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 102 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf