Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Evaluation of sampling in geometallurgical programs through synthetic deposit model
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Mineralteknik och metallurgi.ORCID-id: 0000-0002-9227-2470
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Mineralteknik och metallurgi.
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Mineralteknik och metallurgi.
Antal upphovsmän: 32016 (Engelska)Ingår i: (IMPC 2016), Canadian Institute of Mining, Metallurgy and Petroleum, 2016Konferensbidrag, Publicerat paper (Refereegranskat)
Abstract [en]

The main purpose of geometallurgy is to develop a model to predict the variability in the mineralprocessing performance within the ore body. Geometallurgical tests used for developing such a model need to be fast, practical and inexpensive and include as an input data relevant and measureable geological parameters like elemental grades, mineral grades and grain size. Important in each geometallurgical program is to define the number of samples needed to be sent for geometallurgical testing to enable reliable metallurgical forecast. This is, however, a complicated question that does not have a generic answer.

To study the question on sampling a simulation environment was built including a synthetic orebody and sampling & assaying module. A synthetic Kiruna type iron oxide - apatite deposit was established based on case studies of Malmberget ore. The synthetic ore body includes alike variability in rock types, modal mineralogy, chemical composition, density and mineral textures as its real life counterpart. The synthetic ore body was virtually sampled with different sampling densities for a Davis tube testing, a geometallurgical test characterising response in magnetic separation. Based on the test results a forecast for the processing of the whole ore body was created. The forecasted parameters included concentrate tonnages, iron recovery and concentrate quality in terms of iron, phosphorous and silica contents.

The study shows that the number of samples required for forecasting different geometallurgicalparameters varies. Reliable estimates on iron recovery and concentrate mass pull can be made with about 5-10 representative samples by geometallurgical ore type. However, when the concentrate quality in terms of impurities needs to be forecasted, the sample number is more than 20 times higher. This is due to variation in mineral liberation and shows the importance of developing techniques to collect qualitative information on mineral and ore textures in geometallurgy.

Ort, förlag, år, upplaga, sidor
Canadian Institute of Mining, Metallurgy and Petroleum, 2016.
Nyckelord [en]
Sampling, synthetic ore body, simulation, geometallurgical testing framework.
Nationell ämneskategori
Metallurgi och metalliska material
Forskningsämne
Mineralteknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-59640Scopus ID: 2-s2.0-85048351936ISBN: 978-1-926872-29-2 (tryckt)OAI: oai:DiVA.org:ltu-59640DiVA, id: diva2:1034005
Konferens
XXVIII International Mineral Processing Congress (IMPC 2016), Quebec City, Canada, 11–15 September 2016
Tillgänglig från: 2016-10-10 Skapad: 2016-10-10 Senast uppdaterad: 2018-11-14Bibliografiskt granskad
Ingår i avhandling
1. Bringing predictability into a geometallurgical program: An iron ore case study
Öppna denna publikation i ny flik eller fönster >>Bringing predictability into a geometallurgical program: An iron ore case study
2019 (Engelska)Doktorsavhandling, sammanläggning (Övrigt vetenskapligt)
Alternativ titel[sv]
Skapande av predikterbarhet i ett geometallurgiskt program : en fallstudie med järbnmalm
Abstract [en]

The risks of starting, operating and closing mining projects have become higher than ever. In order to stay ahead of the competition, mining companies have to manage various risks: technical, environmental, legal, regulatory, political, cyber, financial and social. Some of these can be mitigated with the help of geometallurgy. Geometallurgy aims to link geological variability with responses in the beneficiation process by a wide usage of automated mineralogy, proxy metallurgical tests, and process simulation. However, traditional geometallurgy has neglected the non-technical aspects of mining. This has caused wide-spread discussion among researchers on the benefits of geometallurgy and its place in industry.

In order to improve predictability in geometallurgy, such programs should cover planning, and the testing of hypotheses, and only then should there be an attempt to develop suitable technical tools. Such approach would ensure that those tools would be useful and are needed, not only from the technical point of view, but also from the users’ perspective. Therefore, this thesis introduces methodology on how to decrease uncertainty in the production planning and thus determine how much effort to put into decreasing uncertainty in geometallurgical programs.

The predictability improvement of a geometallurgical program starts at the planning stage. The classification system developed here, through the survey (interviews) and literature review, indicates different ways to link geological information with metallurgical responses, and suggests areas where technical development is called for. The proposed developments can be tested before the start of the geometallurgical program with synthetic data. For the iron ore reference study (Malmberget), it was shown that implementation of geometallurgy is beneficial in terms of net present value (NPV) and internal rate of return (IRR), and building geometallurgical spatial model for the process properties (recovery and total concentrate tonnages), and that it requires fewer samples for making a reliable process prediction than concentrate quality. The new process and proxy for mineralogical characterisation models were developed as part of the geometallurgical program for the iron ore case study (Leveäniemi): an estimator of ore quality (ܺ௅்௎), a model for iron recovery in WLIMS, a model for iron-oxides liberation prediction. Additionally, it was found that DT may be applied only for studying marginal ores. The evaluation of different spatial process modelling methods showed that tree methods can be successfully employed in predicting non-additive variables (recoveries).

Ort, förlag, år, upplaga, sidor
Luleå: Luleå University of Technology, 2019
Serie
Doctoral thesis / Luleå University of Technology 1 jan 1997 → …, ISSN 1402-1544
Nyckelord
Additivity, Apatite iron ore, AIO, Block model, Change of support, Classification, Data integration, DT, Feed quality, Geometallurgical program, Geometallurgy, Iron ore, Iron recovery, Leveäniemi, Liberation, Machine learning, Magnetic separation, Malmberget, Mineralogical approach, Mineralogy, Prediction, Proxies, Proxies approach, Sampling, Simulation, Synthetic ore body, Traditional approach, WLIMS
Nationell ämneskategori
Mineral- och gruvteknik Metallurgi och metalliska material
Forskningsämne
Mineralteknik
Identifikatorer
urn:nbn:se:ltu:diva-71580 (URN)978-91-7790-266-9 (ISBN)978-91-7790-267-6 (ISBN)
Disputation
2019-02-04, D770, Lulea, 10:00 (Engelska)
Opponent
Handledare
Tillgänglig från: 2018-11-14 Skapad: 2018-11-14 Senast uppdaterad: 2019-02-07Bibliografiskt granskad

Open Access i DiVA

fulltext(1552 kB)239 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 1552 kBChecksumma SHA-512
ac4ff8f2fbb808611681ddcda6dcc430da6cd066d69236ee33914171d4f4235351a66af760f39131979ebdc74af307f411b0b13a3668e033edaa31bee0f42c1a
Typ fulltextMimetyp application/pdf

Scopus

Personposter BETA

Lishchuk, ViktorLamberg, PerttiLund, Cecilia

Sök vidare i DiVA

Av författaren/redaktören
Lishchuk, ViktorLamberg, PerttiLund, Cecilia
Av organisationen
Mineralteknik och metallurgi
Metallurgi och metalliska material

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 239 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

isbn
urn-nbn

Altmetricpoäng

isbn
urn-nbn
Totalt: 319 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf