Strategic rehabilitation of the earthquake affected microhydropower plants in Nepal
Department of Mechanical Engineering, Kathmandu University.ORCID-id: 0000-0001-5833-6736
Department of Mechanical Engineering, Kathmandu University.
Department of Mechanical Engineering, Kathmandu University.
Resource Management and Rural Empowerment Centre (REMREC), National Rural and Renewable Energy Programme/Alternative Energy Promotion Centre (AEPC).
Visa övriga samt affilieringar
2016 (Engelska)Ingår i: IOP Conference Series: Earth and Environment, ISSN 1755-1307, E-ISSN 1755-1315, Vol. 49, nr 10, artikel-id 102003Artikel i tidskrift (Refereegranskat) Published
Abstract [en]

Most people in the rural areas of Nepal rely on Micro-hydro Power Plants (MHPs) for their energy sources. With around four decade experiences in design and development of MHPs, Nepalese techno-entrepreneurs have gained wider reputation in the South Asian region and the beyond. However with the lack of competences in developing Francis turbines, majority of the MHPs are equipped with either Pelton of Cross Flow turbine, even though Francis units are suitable. With the devastating earthquake of a 7.6 magnitude that struck in the Gorkha district on Saturday, 25 April 2015, about 76 km northwest of the capital city Kathmandu, and the aftershocks followed claimed more than 8000 lives. It did not leave hydropower plants either. Many big plants have been affected and hundreds of MHPs were damaged, needing short to long term rehabilitation. The preliminary assessment of the 61 affected MHPs in the 6 earthquake affected districts shows more than 50% sites are suitable for Francis turbine. Hence the strategic rehabilitation plan has been developed in the present paper for the affected plants considering issues like geographical shift, dislocation of people and also with the focus on replacing the old turbine with Francis turbine in the suitable sites. The similar strategy can also be implemented in other developing countries with such situations.

Ort, förlag, år, upplaga, sidor
Institute of Physics (IOP), 2016. Vol. 49, nr 10, artikel-id 102003
Nationell ämneskategori
Energiteknik Strömningsmekanik och akustik
Forskningsämne
Strömningslära
Identifikatorer
URN: urn:nbn:se:ltu:diva-65056DOI: 10.1088/1755-1315/49/10/102003ISI: 000400156200141Scopus ID: 2-s2.0-85012159898OAI: oai:DiVA.org:ltu-65056DiVA, id: diva2:1131442
Konferens
28th IAHR symposium on Hydraulic Machinery and Systems (IAHR 2016), Grenoble, France, 4–8 July 2016
Anmärkning

Konferensartikel i tidskrift;2017-08-17 (rokbeg)

Tillgänglig från: 2017-08-14 Skapad: 2017-08-14 Senast uppdaterad: 2018-11-23Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

Förlagets fulltextScopus

Personposter BETA

Baidar, Binaya

Sök vidare i DiVA

Av författaren/redaktören
Baidar, Binaya
I samma tidskrift
IOP Conference Series: Earth and Environment
EnergiteknikStrömningsmekanik och akustik

Sök vidare utanför DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetricpoäng

doi
urn-nbn
Totalt: 137 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf