Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Replacement team of mining drilling rigs
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0001-5620-5265
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0001-7744-2155
2014 (English)In: Proceedings of Maintenance Performance Measurement and Management: th - 5th September 2014 Coimbra, Portugal : (MPMM 2014), 2014Conference paper, Published paper (Refereed)
Abstract [en]

This paper presents a practical model to calculate the optimal replacement time (ORT) of drilling rigs used in underground mining. As a case study, cost data for drilling rig were collected over four years from a Swedish mine. The cost data include acquisition, operating, maintenance and downtime costs when using a redundant rig. A discount rate is used to determine the value of these costs over time. The study develops an optimisation model to identify the ORT of a mining drilling rig which represents a key performance indicator. It uses an artificial neural network (ANN) technique to identify the effect of the various cost factors on the ORT. The absolute ORT in the case study is 87 months, and there is an optimal replacement range within which the company can replace the rig. The results also show that the redundant rig cost has the largest impact on the ORT followed by acquisition, maintenance and operating costs. Regression analysis shows a linear relationship between the cost factors and the ORT of the drilling rig.

Place, publisher, year, edition, pages
2014.
Keywords [en]
capital equipment, decision support models, life cycle cost, optimal replacement time, optimisation model
National Category
Other Civil Engineering
Research subject
Operation and Maintenance
Identifiers
URN: urn:nbn:se:ltu:diva-29536DOI: 10.14195/978-972-8954-42-0_17Local ID: 30afe737-da00-448d-959f-55047b297260ISBN: 978-972-8954-42-0 (electronic)OAI: oai:DiVA.org:ltu-29536DiVA, id: diva2:1002760
Conference
Maintenance Performance Measurement and Management : 04/09/2014 - 05/09/2014
Note

Godkänd; 2014; 20140917 (hasham)

Available from: 2016-09-30 Created: 2016-09-30 Last updated: 2022-09-23Bibliographically approved

Open Access in DiVA

fulltext(123 kB)199 downloads
File information
File name FULLTEXT01.pdfFile size 123 kBChecksum SHA-512
821e668a57a891dda3bb005ed14cc745b90fb1133e948198ea5797f83614d275b2254cd2d3a5c44380a2c61b5253ce5b742ba7e59f7144c04caf1278b5f35d32
Type fulltextMimetype application/pdf

Other links

Publisher's full texthttps://digitalis.uc.pt/pt-pt/content/livro?id=33309

Authority records

Hamodi, HussanLundberg, Jan

Search in DiVA

By author/editor
Hamodi, HussanLundberg, Jan
By organisation
Operation, Maintenance and Acoustics
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 202 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 145 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf