Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Punctuality measurements effect on the maintenance process: a study of train delay statistics for the Swedish railway
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0002-6479-9101
2005 (English)In: Abstracts of the Eighth International Conference "Maintenance & Renewal of Permanent Way; Power & Signalling; Structures & Earthworks": Railway Engineering 2005 / [ed] M.C. Forde, Engineering Technics Press , 2005, p. 22-Conference paper (Other academic)
Abstract [en]

Governmental regulations state that the Swedish national railway administrator Banverket has an overall responsibility for train punctuality, independent of whether train delays are caused by Banverket or the train operating companies. Banverket is responsible for the functioning of the railway system as a whole, but can with own maintenance and reinvestment activities only affect the infrastructure. Conflicts derive from the two stakeholders' different roles and interests. In order to effectively forecast maintenance needs and costs of the infrastructure, Banverket want that the infrastructure's deterioration caused by the rolling stock should be both as small and as predictable as possible. However, the train operating companies look at the same situation from the other point of view, with a focus on their rolling stock. The interrelationship between the two stakeholder roles and their combined maintenance process is complex, since it is difficult to pinpoint the responsibility for the whole transport system and separate assets. One essential approach, in order to monitor low performance linked to responsible stakeholder roles and causes is to follow up the two measures punctuality and train delays. This paper explores the characteristics of existing train delay statistics and describes risks when maintenance efforts and design of incentives for improved railway operation is based on statistics that does not reflect the true root-causes of problems.

Place, publisher, year, edition, pages
Engineering Technics Press , 2005. p. 22-
National Category
Other Civil Engineering
Research subject
Operation and Maintenance
Identifiers
URN: urn:nbn:se:ltu:diva-31573Local ID: 5cbb5c60-06f1-11dc-b09b-000ea68e967bISBN: 0-947644-56-3 (print)OAI: oai:DiVA.org:ltu-31573DiVA, id: diva2:1004807
Conference
International Conference on Maintenance and Renewal of Permanent Way : Power and Signalling; Structures and Earthworks 29/06/2005 - 30/06/2005
Note

Godkänd; 2005; 20070520 (ysko)

Available from: 2016-09-30 Created: 2016-09-30 Last updated: 2019-11-22Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

http://www.railwayengineering.com

Authority records

Granström, RikardSöderholm, Peter

Search in DiVA

By author/editor
Granström, RikardSöderholm, Peter
By organisation
Operation, Maintenance and Acoustics
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 360 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf