Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Producing water by condensation of humid air in buried pipe
Mechanical Engineering Faculty of Engineering and Applied Science, Memorial Univ of Newfoundland, St. John's, NF.
Mechanical and Industrial Engineering Faculty of Engineering, Tripoli University.
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Geoteknologi.ORCID-id: 0000-0002-8564-4360
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Arkitektur och vatten.ORCID-id: 0000-0001-7144-9778
2017 (engelsk)Inngår i: Proceedings of the International Conference on Industrial Engineering and Operations Management: Rabat, Morocco, April 11-13, 2017, IEOM Society , 2017, s. 2270-2281Konferansepaper, Publicerat paper (Fagfellevurdert)
Abstract [en]

This study investigates the possibility of using warm humid air for irrigation and drinking water production, by flowing air over the water surface in a solar still with saline or polluted water. Vapor will be saturated during mixing with the warm air in buried pipe. Finite difference method is employed to simulate the flow of the air long the pipe. The amount of water produced and buried pipe length depends upon the flow velocity, humid air properties and buried pipe diameter. The amount of water produced is 0.02525kg/s (0.0909m3/h). The length of the buried pipe needed in this study is 77.36m for a selected air flow velocity 5m/s with the properties of 70°C, 100% relative humidity at pipe inlet, 40°C and 100% relative humidity at pipe outlet of 0.2m pipe diameter. The results agree with a previous study (Gustafsson & Lindblom, 2001) with -4.0% deviation in water production and 7% of required pipe length

sted, utgiver, år, opplag, sider
IEOM Society , 2017. s. 2270-2281
Emneord [en]
Water Production, Condensation, Humid Air, Underground, Desalination
HSV kategori
Forskningsprogram
Geoteknik; Vattenteknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-65263ISBN: 978-0-9855497-6-3 (digital)OAI: oai:DiVA.org:ltu-65263DiVA, id: diva2:1135275
Konferanse
7th Annual Conference on Industrial Engineering and Operations Management, IEOM 2017, Rabat, Morocco, 11-13 April 2017
Tilgjengelig fra: 2017-08-22 Laget: 2017-08-22 Sist oppdatert: 2018-06-26bibliografisk kontrollert

Open Access i DiVA

fulltext(987 kB)66 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 987 kBChecksum SHA-512
dc2aacbd926d4a416ef565da83bd91744f523542ec9ae90e79a81b71ffddc3504e79be774017e8a492cb8d8e73cc34f048120706c7a0f8a5a1c09cf7739f56e8
Type fulltextMimetype application/pdf

Personposter BETA

Lindblom, JennyNordell, Bo

Søk i DiVA

Av forfatter/redaktør
Lindblom, JennyNordell, Bo
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 66 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

isbn
urn-nbn

Altmetric

isbn
urn-nbn
Totalt: 710 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf