To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carried out on a 55 year old five-span bridge with a length of 121 m in Kiruna in northern Sweden. Both non-destructive and destructive full-scale tests were performed. This paper presents results regarding methods for assessment of the structural capacity of concrete bridges.