Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Strategies for Reducing Moral Hazard in Construction Procurement: A Conceptual Framework
Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle, Innovation och Design.ORCID-id: 0000-0002-1746-2637
Kungliga tekniska högskolan, KTH.
2016 (engelsk)Inngår i: Journal of Self-Governance and Management Economics, ISSN 2329-4175, Vol. 4, nr 1, s. 7-33Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Moral hazard and opportunism is an inherent part of contracting and procurement strategies, especially in complex transactions that require co-creation, which is often the case in the construction industry. This paper clarifies the meaning of moral hazard in the context of construction procurement. Typically there is a double moral hazard problem, as not only the supplier, but also the client can "misbehave" in a number of ways. It is also important to note that both internal moral hazard (within the client and contractor organizations) and external moral hazard (between client and contractor) must be handled. The aim of this conceptual paper is to give an overview of strategies to reduce the risk of moral hazard. Eight different strategies are identified: 1) "the shadow of the future," promises of future work if effort is high 2) selection mechanism for contractor/employee, 3) length of contract, length of warranties, 4) level of detail in the contract, 5) payment systems, 6) monitoring intensity, 7) social norms, and 8) relation specific investments. These can be grouped into two ideal types; hard/formal and soft/informal strategies, of which the first is most suitable in simple and standardized projects, whereas soft/informal strategies are better in complex and uncertain projects.

sted, utgiver, år, opplag, sider
2016. Vol. 4, nr 1, s. 7-33
HSV kategori
Forskningsprogram
Entreprenörskap och innovation
Identifikatorer
URN: urn:nbn:se:ltu:diva-4611DOI: 10.22381/JSME4120161Lokal ID: 294b42f2-04f2-47bd-8df7-2da587022981OAI: oai:DiVA.org:ltu-4611DiVA, id: diva2:977485
Merknad

Godkänd; 2016; 20160722 (inah)

Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2020-01-28bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fullteksthttp://www.procsibe.se/dokument/2015/Strategies_for_reducing_moral_hazard.pdf

Personposter BETA

Eriksson, Per-Erik

Søk i DiVA

Av forfatter/redaktør
Eriksson, Per-Erik
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 244 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf