A proactive plan-do-check-act approach to defect management based on a Swedish construction project
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.ORCID iD: 0000-0003-1462-7827
John Meiling AB.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.ORCID iD: 0000-0002-2699-2533
2014 (English)In: Construction Management and Economics, ISSN 0144-6193, E-ISSN 1466-433X, Vol. 32, no 11, p. 1051-1065Article in journal (Refereed) Published
Abstract [en]

In order to continuously improve quality and avoid reoccurrence of defects, defect management (DM) in construction needs to take a more proactive approach. The classification of construction information is important for the efficient exchange and integration of data between the many roles and phases of construction and facility management, but it also provides a framework for standardization, which in turn is paramount for improvement. In order to better understand how defects can be managed proactively we conducted a case study on inspection practices at a large construction project in Sweden, using observation and analysis of inspection reports. We identified opportunities and obstacles in the classification of defect data. The project’s defect descriptions were often ambiguous and the records lacked important contextual information. We believe that this was because current practice is not designed with proactivity in mind, and there are only regulatory requirements on the data, making classification difficult. In addition, by viewing the project’s practices through the lenses of continuous improvement and plan-do-check-act theory to identify missing or inadequate steps, we propose a framework for a proactive version of the current defect management process that could potentially help to prioritize improvement work and reduce the incidence of defects

Place, publisher, year, edition, pages
2014. Vol. 32, no 11, p. 1051-1065
Keywords [en]
Building defects, Classification, Continuous Improvement, Inspection, Quality Management, Civil engineering and architecture - Building manufacturing engineering
Keywords [sv]
Samhällsbyggnadsteknik och arkitektur - Byggproduktionsteknik
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
URN: urn:nbn:se:ltu:diva-10184DOI: 10.1080/01446193.2014.966733Scopus ID: 2-s2.0-84908134760Local ID: 8f12f5f8-ab48-4a80-826f-0c9afc0c0ca2OAI: oai:DiVA.org:ltu-10184DiVA, id: diva2:983124
Note
Validerad; 2014; 20140926 (marsan)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-07-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records BETA

Lundkvist, RobertMeiling, JohnSandberg, Marcus

Search in DiVA

By author/editor
Lundkvist, RobertMeiling, JohnSandberg, Marcus
By organisation
Structural and Construction Engineering
In the same journal
Construction Management and Economics
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 314 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf