Mosul Dam the Full Story: Engineering Problems
LTU team.
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Geoteknologi.ORCID-id: 0000-0002-6790-2653
2016 (engelsk)Inngår i: Journal of Earth Sciences and Geotechnical Engineering, ISSN 1792-9040, E-ISSN 1792-9660, Vol. 6, nr 3, s. 213-244Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

The idea of building of Mosul Dam project started in 1950 and it was referred to as Aski Mosul Dam. Since that time, number of companies worked on the site selection and design of the dam. All the above companies suggested that the dam should be Earth-fill type with compressed clay core but there were different views about the exact location of the dam, spillway and electricity generating station. Grouting was suggested to be performed under the dam, spillway and the electricity generating station. In addition, they suggested that detailed geological investigation should be performed before any construction activities. In 1978, the Swiss Consultants Consortium was asked to be the consultants for Mosul Dam project. The consultants suggested that the operational water level at the dam to be 330 m (a.s.l.) while the flood and normal water levels to be 338 and 335 m (a.s.l.), respectively. The work started on 25th January, 1981 and finished 24th July, 1986. The foundation of the dam is built on alternating beds of limestone and gysum. Seepages due to the dissolution of gypsum were noticed and after impounding in 1986, new seepage locations were recognized. Grouting operations continued and various studies were conducted to find suitable grout or technique to overcome this problem. The seepage due to the dissolution of gypsum and anhydrite beds raised a big concern about the safety of the dam and its possible failure. It is believed that grouting will not solve this problem permanently

sted, utgiver, år, opplag, sider
Scienpress Ltd , 2016. Vol. 6, nr 3, s. 213-244
HSV kategori
Forskningsprogram
Geoteknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-11981Lokal ID: b0925d11-7f6c-4a93-bb03-6370c734044bOAI: oai:DiVA.org:ltu-11981DiVA, id: diva2:984931
Merknad

Validerad; 2016; Nivå 1; 20160825 (nadhir)

Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2018-12-14bibliografisk kontrollert

Open Access i DiVA

fulltext(1100 kB)328 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1100 kBChecksum SHA-512
247585d5f8bd2be2199d074b3bf2d97e4963625dbc7c0e8e171d25069929e298316a995d20c5a05093baf9cad09d2a01c82b34e32d257a14519e1afe4cda5b4e
Type fulltextMimetype application/pdf

Personposter BETA

Al-Ansari, Nadhir

Søk i DiVA

Av forfatter/redaktør
Al-Ansari, Nadhir
Av organisasjonen
I samme tidsskrift
Journal of Earth Sciences and Geotechnical Engineering

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 328 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1006 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf