Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.ORCID iD: 0000-0002-5661-5237
2007 (English)In: Automation in Construction, ISSN 0926-5805, E-ISSN 1872-7891, Vol. 16, no 2, p. 189-198Article in journal (Refereed) Published
Abstract [en]

There is a great potential to improve the flow of resources through locations on construction sites, termed work-flow. Current activity-based scheduling techniques do not provide adequate support for the planning of work-flow due to practical and methodological reasons. Location-based scheduling techniques provide a promising alternative to activity-based scheduling techniques for planning of work-flow. However, neither location-based nor activity-based scheduling techniques provide users with insight in the spatial configuration of scheduled construction operations. A technique that can provide this insight is 4D CAD in which 3D CAD models are combined with data from construction schedules. This article presents a process method for the planning of work-flow by combined use of location-based scheduling and 4D CAD. We suggest that a location-based approach to 4D CAD can improve the usability of the 4D CAD models for work-flow analyses. In addition, the article suggests that 4D CAD can enhance the value of location-based schedules.

Place, publisher, year, edition, pages
2007. Vol. 16, no 2, p. 189-198
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
URN: urn:nbn:se:ltu:diva-12933DOI: 10.1016/j.autcon.2006.04.001ISI: 000242815100006Scopus ID: 2-s2.0-33846023352Local ID: c14d0e00-8a9e-11db-8975-000ea68e967bOAI: oai:DiVA.org:ltu-12933DiVA, id: diva2:985884
Note
Validerad; 2007; 20061122 (ysko)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-07-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records BETA

Jongeling, RogierOlofsson, Thomas

Search in DiVA

By author/editor
Jongeling, RogierOlofsson, Thomas
By organisation
Structural and Construction Engineering
In the same journal
Automation in Construction
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 105 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf