Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Model for economic replacement time of mining production rigs including redundant rig costs
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0001-5620-5265
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0001-7744-2155
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.ORCID iD: 0000-0002-9987-0174
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0001-7083-4009
Show others and affiliations
2015 (English)In: Journal of Quality in Maintenance Engineering, ISSN 1355-2511, E-ISSN 1758-7832, Vol. 21, no 2, p. 207-226Article in journal (Refereed) Published
Abstract [en]

Purpose - This paper presents a practical model to determine the economic replacement time (ERT) of production machines. The objective is to minimise the total cost of capital equipment, where total cost includes acquisition, operating, maintenance costs and costs related to the machine’s downtime. The costs related to the machine’s downtime are represented by the costs of using a redundant machine. Design/methodology/approach - Four years of cost data are collected. Data is analysed, practical optimisation model is developed and regression analysis is done to estimate the drilling rigs ERT. The artificial neural network (ANN) technique is used to identify the effect of factors influencing the ERT of the drilling rigs.Findings - The results show that the redundant rig cost has the largest impact on ERT, followed by acquisition, maintenance and operating costs. The study also finds that increasing redundant costs per hour have a negative effect on ERT, while decreases in other costs have a positive effect. Regression analysis shows a linear relationship between the cost factors and ERT. Practical implications - The proposed approach can be used by the decision maker in determining the economic replacement time of production machines which used in mining industry.Originality/value - The research proposed in this paper provides and develops an optimisation model for economic replacement time of mining machines. This research also identifies and explains the factors that have the largest impact on the production machine’s ERT. This model for estimating the ERT has never been studied on mining drilling rigs.Keywords Decision support model, Life cycle cost, Optimisation, Replacement timePaper type Research paper

Place, publisher, year, edition, pages
2015. Vol. 21, no 2, p. 207-226
National Category
Other Civil Engineering
Research subject
Operation and Maintenance
Identifiers
URN: urn:nbn:se:ltu:diva-15537DOI: 10.1108/JQME-07-2014-0041ISI: 000211515300005Scopus ID: 2-s2.0-84929074579Local ID: f116c303-ba8e-43b6-9aff-48109010af18OAI: oai:DiVA.org:ltu-15537DiVA, id: diva2:988511
Note
Validerad; 2015; Nivå 1; 20141016 (hasham)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2022-10-28Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Hamodi, HussanLundberg, JanAl-Gburi, MajidAhmadi, AlirezaGhodrati, Behzad

Search in DiVA

By author/editor
Hamodi, HussanLundberg, JanAl-Gburi, MajidAhmadi, AlirezaGhodrati, Behzad
By organisation
Operation, Maintenance and AcousticsStructural and Construction Engineering
In the same journal
Journal of Quality in Maintenance Engineering
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 330 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf