An approach to long range production and development planning with application to the Kiruna Mine, Sweden
Luleå tekniska universitet.
1994 (Engelska)Doktorsavhandling, sammanläggning (Övrigt vetenskapligt)
Abstract [en]

The mining industry is increasingly oriented towards large scale mining and the planning concept of "Just in Time", which means activities starting and ending as late as possible without jeopardising production. The buffers, consisting of production blocks and development ahead of production, are then minimi. This, however, leads to a larger dependency on the quality of the output from the production systems. The Kiruna mine, Sweden, is a large scale mine and has a number of potential ore blocks with a content that varies in quality (Fe, P, K) and in quantity (ore tonnage). Ore production is restricted by operative and block sequencing constraints as well as by production requirements. A computerized planning model, based on operations research (multi period scheduling) has been developed to meet future demands on ore qualities and quantities. The model uses long range objectives, but can satisfy temporary short range demands without jeopardising the long range goals. A sub-optimal plan, made using the model, has been compared with a truly optimal plan. It is shown that, due to the unreliable information concerning the ore, the sub-optimal plan performs as well as the optimal one. The simulation process that was developed for this comparison is also used to estimate the need for production buffer blocks. Another buffer planning model is developed to determine when development work should take place in order to minimize the risk of additional costs, caused by an inability to start production on time. This algorithm considers the uncertainties in activity durations and is based on a Monte Carlo simulation using project networks and estimates the optimum development buffer.

Ort, förlag, år, upplaga, sidor
Luleå: Luleå tekniska universitet, 1994. , s. 175
Serie
Doktorsavhandling / Högskolan i Luleå, ISSN 0348-8373 ; 143
Nationell ämneskategori
Annan samhällsbyggnadsteknik
Forskningsämne
Gruv- och Berganläggningsteknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-25790Lokalt ID: b1fd7500-f661-11db-ac79-000ea68e967bOAI: oai:DiVA.org:ltu-25790DiVA, id: diva2:998947
Anmärkning
Godkänd; 1994; 20070429 (ysko)Tillgänglig från: 2016-09-30 Skapad: 2016-09-30Bibliografiskt granskad

Open Access i DiVA

fulltext(79574 kB)65 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 79574 kBChecksumma SHA-512
66064e3878ae1b1469161b7f6d6b674609fc8586a4bb1973d09c7f5bfa28dabccdc9f0142084f39eb686e8bbc0e7bccfe3497cdd5fabc2b5c9b12b16578a5f3c
Typ fulltextMimetyp application/pdf

Annan samhällsbyggnadsteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 65 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 361 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf