Three long instrumented bored piles have been tested in the ground of a multilayer soil of clay and sand. The shaft load transfer mechanism was investigated with regard to the soil type, pile geometry and test procedures. Additional pile tests of large displacement penetration have also been carried out to study the performance of tip resistance. Special attention is given to the installation procedure of piles, which may play a significant role in the performance of the bored piles.