Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Standardizing the pre-design-phase for improved efficiency in off-site housing projects
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.ORCID iD: 0000-0002-3067-9451
2010 (English)In: ARCOM twenty-Sixth Annual Conference 2010, September 6-8, Leeds / [ed] Charles O. Egbu; Eric Lou, Reading: Association of Researchers in Construction Management , 2010, Vol. 2, p. 1259-68Conference paper, Published paper (Refereed)
Abstract [en]

Long erection times on-site and project-specific design work, performed by consultants, generally accounts for a large part of correction and building costs in construction projects. In a typical Swedish housing project, the pre- and design phase accounts for about 10-12 % of the total costs. Due to a lack of standardized conceptualization procedures, much of the design work is reiterated in each project, and thus avoidable costs are incurred. In order to minimize these problems an open building system, called MFB, which exploits standardized technical solutions, design and construction processes for off-site prefabricated housing is under development. The MFB system developer will provide a process manual that describes, in detail, standardized design, construction, and erection processes. The open building system relies on close cooperation with local, often small to medium-sized, enterprises that can efficiently undertake “local” building projects. Here, we present and analyse a standard procedure for the pre-design-phase to incorporate in a MFB-process manual. The pre-design-phase of a MFB-building project was recorded and analysed in terms of efficiency. A detailed process map is presented, showing that 122 process steps were logged from the first contact with the client until the generation of the tender. By standardizing the pre-design-phase, the number of essential activities could be reduced by 47%. An improvement in time efficiency of the pre-design-phase with co-instantaneous generation of effective cost estimates should lead to lower building costs in general. Furthermore, by tightly standardizing and controlling the process, it should be possible to repeat projects (or many aspects of projects), without repeating much of the pre-design-phase, even if the actors change.

Place, publisher, year, edition, pages
Reading: Association of Researchers in Construction Management , 2010. Vol. 2, p. 1259-68
National Category
Building Technologies
Research subject
Timber Structures
Identifiers
URN: urn:nbn:se:ltu:diva-33101Scopus ID: 2-s2.0-84861026899Local ID: 7e1a1f0a-9826-4189-b0c3-365bedf08c4aISBN: 978-0-9552390-4-5 (print)OAI: oai:DiVA.org:ltu-33101DiVA, id: diva2:1006336
Conference
Annual ARCOM Conference : 06/09/2010 - 08/09/2010
Note
Godkänd; 2010; 20110831 (ysko)Available from: 2016-09-30 Created: 2016-09-30 Last updated: 2023-10-06Bibliographically approved

Open Access in DiVA

fulltext(231 kB)201 downloads
File information
File name FULLTEXT01.pdfFile size 231 kBChecksum SHA-512
500e1c98b133fd6265be4d286a211fdb51ca99942bcf96ef85f5950d08e1b9424692d20c3c5c8194c20c2cffd917d3878af8626e8da8843553a6f4b6babc5300
Type fulltextMimetype application/pdf

Scopus

Authority records

Haller, MartinStehn, Lars

Search in DiVA

By author/editor
Haller, MartinStehn, Lars
By organisation
Structural and Construction Engineering
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 203 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 358 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf