Change search
ReferencesLink to record
Permanent link

Direct link
A heuristic to solve the economic lot scheduling problem even when there is a high utilization of the facility
Luleå University of Technology, Department of Business Administration, Technology and Social Sciences, Business Administration and Industrial Engineering.
University of Amsterdam.
2009 (English)Conference paper, Presentation (Other academic)
Abstract [en]

Here we present a heuristic that starts with the common cycle solution finding an optimal time interval for the common frequencies; thereafter in "powers of two' try to reduce or increase the frequency for one item at a time, and the right and lowest possible inventory holding costs (for these different frequencies); and continue in this way until no better solution is found. This heuristic can also be combined with costs for operating the production facility depending on the number of hours the facility is operating per working day.

Place, publisher, year, edition, pages
2009.
Research subject
Industrial Logistics
Identifiers
URN: urn:nbn:se:ltu:diva-34785Local ID: 912632c0-b30d-11de-b4d6-000ea68e967bOAI: oai:DiVA.org:ltu-34785DiVA: diva2:1008036
Conference
European conference on operations research : 05/07/2009 - 08/07/2009
Note
Godkänd; 2009; 20091007 (keni)Available from: 2016-09-30 Created: 2016-09-30Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Segerstedt, Anders
By organisation
Business Administration and Industrial Engineering

Search outside of DiVA

GoogleGoogle Scholar

Total: 9 hits
ReferencesLink to record
Permanent link

Direct link