The methodology developed under the project FRAMEUP includes the construction of residential buildings from the top to the base, whose compartments are prefabricated modules. The construction begins with the execution of the roof, on the ground level, which is later on lifted, allowing from beneath the construction of the lower floors, while it protects them from the weather. The construction ends with the execution of the ground floor. It is adopted a framed structure with tubular sections for which the beam-to-column connections are developed and the columns-splices designed to facilitate and the use of this constructive methodology.