Project: CAMM - Lean mining
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.
Sverige.
2012 (English)Other (Other (popular science, discussion, etc.))
Abstract [en]

The current status of Scandinavian mining industry is characterized by semi-autonomous to autonomous and intelligent production machines. Since many of these autonomous machines are expected to perform round the clock, the importance of system characteristics such as reliability, availability, flexibility and controllability are of prime importance. Other area is focused on seamless integration of information to realize the vision of autonomous mining system and been actively developing and implementing the concept of collaborative and intelligent operation and maintenance for operating systems. Therefore, the vision of a Digital Mine with autonomous mining systems seems a possibility especially with the advent of new and emerging technologies together with willingness of mining industry to make investment towards semi autonomous and autonomous mining systems.For achieving lean production, all the processes and systems need to communicate in real time so as to eliminate uncertainty and address the critical issues and challenges often arising at short notices in a continuously changing environment as found in mining operations.The plan for research development intends to take the mining industry several steps forward in creating a reliable robust and productive autonomous mining system. Our goal is to build a state of the art research capability in the area of mine production system by working on the following subproject addressing the critical issues to realise the vision of lean mining system.Work plan A: Improvement of production availability and delivery assuranceWork plan B:Rock and machine interfaceWork plan C:Remaining useful life of mining systemsWork plan D:Integration of mine work environment into production systems

Place, publisher, year, edition, pages
2012.
Keyword [sv]
PA, RUL, RAMS
Research subject
Operation and Maintenance
Identifiers
URN: urn:nbn:se:ltu:diva-36285Local ID: dc76b4f3-cae5-4ad9-ba50-b5fb816c256fOAI: oai:DiVA.org:ltu-36285DiVA: diva2:1009543
Note

Publikationer: Cost-effective maintenance scheduling of cutting arms of drum shearer machine; Mine Production index (MPi): New method to evaluate effectiveness of mining machinery; Assessment of Reliability-Related Measures for Drum Shearer Machine: a Case Study; Maintenance planning for drum shearer machine based on its reliability characteristics and economical sensitivity analysis; Mine production index: Development and application; Status: Ongoing; Period: 15/01/2010 → 01/02/2014

Available from: 2016-09-30 Created: 2016-09-30 Last updated: 2016-10-03Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Ghodrati, BehzadKumar, Uday
By organisation
Operation, Maintenance and Acoustics

Search outside of DiVA

GoogleGoogle Scholar

Total: 12 hits
ReferencesLink to record
Permanent link

Direct link