Change search
ReferencesLink to record
Permanent link

Direct link
Modern tools and equipment for tunnelling and drifting
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.
2009 (English)In: SRDM Safe & Rapid Development Mining 2009: Proceedings of the First International Seminar of Safe and Rapid Development Mining, Nedlands, WA: Australian Centre for Geomechanics, 2009Conference paper (Refereed)
Abstract [en]

Tunnelling is a key activity in infrastructure projects and in mine development and production. The speed of tunnelling has always been important, especially in underground constructions, where profit is often linked to how fast the job can be done. This is also valid for development in the mining industry. However, for the miner the situation is sometimes different, in that his ambition is to fulfil ore production targets with as small an input of resources as possible. This means that the main objective has been the utilisation of machinery and labour. In the mine development phase, on the other hand, a rapid access to the orebody is crucial, since it will yield a quicker pay back of the investment.Even if rapid development advance is a priority, it is important to recognise that modern tunnelling technique and equipment can provide additional benefits including: production control, improvement in tunnel and profile quality, characterisation of the surrounding rock mass, etc.During the past few years increased focus has been placed on communication technology improving the flow of information to and from the rig. Information on production, quality, maintenance, ground characterisation, etc., can be supplied by the rig if the technical framework is present. Logging functions have also been extended and can now provide detailed information on production, drill hole quality, the maintenance requirements and drill monitoring for geological and geotechnical characterisation of rock mass ahead of the face. Computerised drill plan design enables a drilling sequence to be designed by computer based on the tunnel design for each section. This technology is now in use and can assist with quality control such that the tunnel will be constructed according to the design with a minimum of over break. The risk of mistakes and faults is minimised and the rig navigation is the only weak point in the chain.This paper presents the state-of-the-art in equipment and tools for tunnel construction, and discusses the benefits available through better process quality control, better tunnel design control and improved knowledge of the surrounding rock mass and the rock mass ahead of the face.

Place, publisher, year, edition, pages
Nedlands, WA: Australian Centre for Geomechanics, 2009.
Research subject
Mining and Rock Engineering
Identifiers
URN: urn:nbn:se:ltu:diva-37101Local ID: afdeb27f-451b-4fd6-8f47-65f3f233e8f5ISBN: 980418577OAI: oai:DiVA.org:ltu-37101DiVA: diva2:1010599
Conference
International Seminar on Safe and Rapid Development Mining : 06/05/2009 - 07/05/2009
Note
Godkänd; 2009; 20111217 (ysko)Available from: 2016-10-03 Created: 2016-10-03Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Schunnesson, Håkan
By organisation
Mining and Geotechnical Engineering

Search outside of DiVA

GoogleGoogle Scholar

Total: 3 hits
ReferencesLink to record
Permanent link

Direct link