Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utformning av arbetssätt för omställningsförbättringar: Framtaget för Sandvik Coromant
2012 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

The aim of the thesis was to develop a method to be used to improve changeover work at Sandvik Coromant. The work method was designed for use by production managers and operators, it was introduced to them in a training session. The manufacturing is based on customer orders, and batch sizes vary between 2 and 500 pieces. The small batch implies frequent changeover and a need for short changeover times. The method for changeover was designed to be easy to learn and use.The project work began with two weeks practice together with operators. The close contact with operators was valuable for forthcoming interviews and user participation.We have based our method for changeover work on existing tools and methods. These were modified, adapted and combined to an integrated method. A thorough literature review was performed, from which interesting methods and tools were chosen for further investigation. The number of methods and tools were reduced after evaluation with assistance of a requirement specification, which was designed with criteria established after interviews and observations. The final work method includes value stream mapping, force field analysis, hierarchical task analysis, and single-minute exchange of die. Value stream mapping is used to investigate where in the system an improvement contributes the most to the total productivity. A changeover improvement team is established. They use the force field analysis method to highlight hindering and supporting issues and the SMED method for the detailed development of the improved changeover procedure. The project is carried out intensively with three full days of training and intermediate practical work within a period of 6-9 weeks.The work method was tested and evaluated through a pilot project. The pilot project was conducted live in a real situation in a representative department in the Gimo plant. We took the role as project leader in the pilot project instead of the production manager. Acting as project leader gave valuable feedback on the proposed method and developed training materials. The pilot project was carried out during six weeks and was assessed as successful. Due to the successful pilot project training sessions were also performed with managers and other interested persons.

Place, publisher, year, edition, pages
2012. , p. 100
Keywords [en]
Technology
Keywords [sv]
Teknik, SMED, omställningsarbete, brukarmedverkan, ställtid, HTA, VFA, Markus Ström, Jonatan Löthman, omställningstider, participation
Identifiers
URN: urn:nbn:se:ltu:diva-51003Local ID: 83b0ff60-a2f6-4bf3-87f0-005004e7399fOAI: oai:DiVA.org:ltu-51003DiVA, id: diva2:1024366
Subject / course
Student thesis, at least 30 credits
Educational program
Industrial Design Engineering, master's level
Supervisors
Examiners
Note
Validerat; 20120614 (anonymous)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

fulltext(7551 kB)489 downloads
File information
File name FULLTEXT02.pdfFile size 7551 kBChecksum SHA-512
baad28d1a59f12c4f4f6df36fcca6fe5ef3594f59828677d1cc50cc923455a0b3f563c962fe52c076f2aa87504d5ef433336368861a358ec2d20a3d41bd1efb2
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Löthman, JonatanStröm, Markus

Search outside of DiVA

GoogleGoogle Scholar
Total: 489 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 269 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf