Change search
ReferencesLink to record
Permanent link

Direct link
Ökad flexibilitet genom prognosmedvetenhet, materialstyrning och ledtidsreducering vid ABB Robotics AB
2000 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Place, publisher, year, edition, pages
2000.
Keyword [en]
Technology
Keyword [sv]
Teknik, logistik, ledtider, materialstyrning, prognoser, flexibilitet, ABB Robotics, ABB, Supply Chain Management, ledtidsreducering, prognossäkerhet, leverantörssamverkan, MPS
Identifiers
URN: urn:nbn:se:ltu:diva-53079ISRN: LTU-EX--00/069--SELocal ID: a280394b-d491-4e1b-8aa0-e65194320599OAI: oai:DiVA.org:ltu-53079DiVA: diva2:1026452
Subject / course
Student thesis, at least 30 credits
Educational program
Civil Engineering programmes 1997-2000, master's level
Examiners
Note
Validerat; 20101217 (root)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

No full text

Search outside of DiVA

GoogleGoogle Scholar

Total: 3 hits
ReferencesLink to record
Permanent link

Direct link