Produktionsstyrning i Byggproduktion: En utvärdering av Peabs nya metod för produktionsstyrning
2016 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

Unproductive time and another form of waste is common in construction. It is quite normal that only about 2/3 of the assigned construction tasks during one week are finished according to plan. Often because the tasks are not sound regarding its prerequisites. New methods for planning and control are needed in construction to improve the reliability of the work flow and to mitigate the waste.In this thesis, the Swedish contractor Peabs’ new method for production control is evaluated. The purpose of the thesis is to illustrate what the impact has been so far in regards to minimizing the amount of disruptions among craftsmen. The purpose is also to find ways to improve the method based on the theory of Last Planner System – a method for production control with its roots in Lean Construction – which has been implemented with great success worldwide. The results is based on a case study carried out on a construction site acting as one of the pilot projects for Peabs’ new method for production control.The authors have conducted a survey to get an understanding of how the new method has affected the amount of disruptions in craftsmen’s daily work. The survey involved craftsmen from the case study project as well as craftsmen within Peab who had only experienced the traditional ways of production control. Besides the survey, the authors also interviewed foremen with experience of both traditional ways of production control, and who had used Peabs’ new method for production control during an entire construction project. The results indicate that Peabs’ new method for production control has decreased the amount of disruptions in craftsmen’s daily work.By conducting interviews and by observing on meetings, the authors got an understanding of Peabs’ new method and how it is used in practice. The authors then identified several deviations from the theory of Last Planner System. On that basis the authors have presented a few suggestions that could improve Peabs’ method. Peab can try out these suggestion in future implementations on their construction sites.

Place, publisher, year, edition, pages
2016. , 71 p.
Keyword [en]
Technology
Keyword [sv]
Teknik, Lean Construction, Last Planner System, Visuell Planering
Identifiers
URN: urn:nbn:se:ltu:diva-58764Local ID: f53354e5-4d03-4023-8256-09f8ea4f225fOAI: oai:DiVA.org:ltu-58764DiVA: diva2:1032152
External cooperation
Subject / course
Student thesis, at least 30 credits
Educational program
Civil Engineering, master's level
Supervisors
Examiners
Note
Validerat; 20160629 (global_studentproject_submitter)Available from: 2016-10-04 Created: 2016-10-04Bibliographically approved

Open Access in DiVA

No full text

Search outside of DiVA

GoogleGoogle Scholar

Total: 35 hits
ReferencesLink to record
Permanent link

Direct link