Cover-Time Planning/Takt Planning: A technique for Materials Requirement and Production Planning
Luleå University of Technology, Department of Business Administration, Technology and Social Sciences, Business Administration and Industrial Engineering.
2017 (English)In: International Journal of Production Economics, ISSN 0925-5273, E-ISSN 1873-7579Article in journal (Refereed) Epub ahead of print
Abstract [en]

Cover-Time Planning, or Takt Planning, is presented. It is a system for calculating material requirements and start of purchases and production. Requested production rates of sales items, or alternative prefabricated modules in stock, are “broken down”, exploded, to create the need for components, for all underlying items (articles) in the Bill of Material. Inventory and already ordered replenishments are compared with the item's desired production rate. How long already made actions are expected to cover the desired expected sales and production rates is compared with the item's lead time; if a forward future shortage is likely the article is signalled for a refill. With examples is described how make-to-order production is done easily. The method is a type of reorder point system, but with time instead of quantity as decision variable. Unlike a traditional reorder point system increases and decreases of production can be planned. Future work load in various production sections can be estimated. It is described how an “Available-to-promise”-system should be designed and used. Cover-Time Planning (CTP) is a complete alternative to Materials Requirements Planning (MRP). CTP responds faster than MRP, since MRP for each structural level uses a batch size to "break down" and to magnify the need at the underlying level. In the end a large material acquisition needs to be ordered maybe just to build a single end item. CTP uses the end item requirement rates on all structural levels shifted with the lead times, when customer demand changes, the entire production chain react simultaneously

Place, publisher, year, edition, pages
2017.
National Category
Production Engineering, Human Work Science and Ergonomics
Research subject
Industrial Logistics
Identifiers
URN: urn:nbn:se:ltu:diva-63049DOI: 10.1016/j.ijpe.2017.04.006OAI: oai:DiVA.org:ltu-63049DiVA: diva2:1088934
Available from: 2017-04-18 Created: 2017-04-18 Last updated: 2017-04-18

Open Access in DiVA

No full text

Other links

Publisher's full text

Search in DiVA

By author/editor
Segerstedt, Anders
By organisation
Business Administration and Industrial Engineering
In the same journal
International Journal of Production Economics
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar

Altmetric score

Total: 160 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf