Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
ANBUD ELLER SKAMBUD: Tre studier om ändringar och tilläggsarbeten som uppstår i samband med entreprenadupphandlingar till en statlig myndighet
Luleå University of Technology, Department of Business Administration, Technology and Social Sciences.
Luleå University of Technology, Department of Business Administration, Technology and Social Sciences.
2017 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [sv]

Upphandling är en central del för att styra statliga resurser och hur de allokeras. Syftet är att förklara avtalsprecision av komplexa byggentreprenader. För att uppnå syftet kommer vi att studera byggprojekt där upphandlingar är utvecklade. Studie 1 besvarar en teoretisk hypotes om att stora projekt skapar fler ÄTA-arbeten. Hypotesen testas med registerdata från en offentlig myndighets interna projektdatabas. Studie 2 söker förklaringar till varför stora projekt driver ÄTA-arbeten. Förklaringar kommer från intervjuer med projektledare och entreprenörer. Studie 3 testas sex olika förklaringar vi benämner post-hoc hypoteser (PHH) som bygger på etablerade begrepp. Testet bygger på enkätdata för beställare och entreprenörer. Den interna projektdatabasen innehöll 486 infrastrukturprojekt (Studie 1). Baserad på projektdatabasen valdes fyra projekt ut för vidare analys. Totalt intervjuades fyra beställare och två entreprenörer kopplat till de utvalda projekten (Studie 2). Totalt deltog 208 respondenter i enkäten varav 87 beställare, 116 entreprenörer och 5 underentreprenörer som kompletterades av två externa entreprenörer (Studie 3).  Resultatet från Studie 1 ger indikation på att dokumentationen, uppföljningen och redovisningen är bristfällig. Detta bekräftades av intervjuerna i Studie 2. I Studie 3 fann vi att projekteringen är bristfällig i stora projekt där parterna agerar missvisande. Resultatet visar på att ÄTA-arbeten drivs av ofullständig projektering, person och ledarskap och av en medveten affärsmodell. Genom bättre dokumentation, uppföljning och redovisning skapas bättre avtalsprecision i upphandlingar och bidrar till meningsfulla processer och en träffsäkrare resursallokering.

Abstract [en]

Procurement is a key part of controlling government resources and how they are allocated. The purpose of this thesis is to explain the contractual precision of complex construction contracts. In order to achieve our objective, we will study construction projects where the procurement is well developed. We pursue this objective based on three studies. Study 1 answers a theoretical hypothesis that large projects create more cost overruns/error. The hypothesis is tested on a project database which is an internal register data from a public bureau. Study 2 seeks explanations as to why large projects drive cost overruns. Explanations come from interviews with project managers and contractors. Study 3 tests six different explanations we refer to post-hoc hypotheses (PHH) based on established concepts. The test is based on survey data for clients and contractors. The project database contained 486 infrastructure projects (Study 1). Based on the project database, four projects were selected for further analysis. A total of four clients and two contractors were interviewed in connection with the selected projects (Study 2). A total of 208 respondents participated in the survey, of which 87 clients, 116 contractors and 5 subcontractors were supplemented by two external contractors (Study 3). The result from study 1 indicates that the documentation, follow-up and reporting are inadequate and confirmed much of the findings in Study 2. In Study 3 we found that the planning is inadequate in large projects and often misleading. The result shows that cost overruns/error is driven by person and leadership, incomplete planning and a conscious business model. Through better documentation, follow-up and accounting, better contractual precision is created in procurement and contributes to meaningful processes and more accurate resource allocation.

Place, publisher, year, edition, pages
2017. , p. 72
Keywords [en]
Procurement, public sector, time overruns, cost overruns, ÄTA, contractual precision, contractual space, contract management, negotiation, incomplete design, documentation, budget, accounting, follow-up, partner opportunism, transaction costs
Keywords [sv]
Upphandlingar, offentlig sektor, tids- och kostnadsöverskridanden, ÄTA-arbeten, avtalsprecision, avtalsutrymme, kontraktsstyrning, förhandling, ofullständig projektering, dokumentering, budget, redovisning, uppföljning, partner opportunism, transaktionskostnader
National Category
Business Administration
Identifiers
URN: urn:nbn:se:ltu:diva-63788OAI: oai:DiVA.org:ltu-63788DiVA, id: diva2:1106778
Subject / course
Student thesis, at least 30 credits
Educational program
Business and Economics, master's level
Supervisors
Examiners
Available from: 2017-06-08 Created: 2017-06-08 Last updated: 2017-06-08Bibliographically approved

Open Access in DiVA

fulltext(1860 kB)269 downloads
File information
File name FULLTEXT01.pdfFile size 1860 kBChecksum SHA-512
ff4b58553f356f3d799aca477d1f28cb283d0099f94bc84981cafb9d0f796e49f9338ca22a53c7c948aba1620caef8c08dbd7f0388417414627e3625b007d32f
Type fulltextMimetype application/pdf

By organisation
Department of Business Administration, Technology and Social Sciences
Business Administration

Search outside of DiVA

GoogleGoogle Scholar
Total: 269 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 657 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf