Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
The effect of pre-engineering on design management methods
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-5907-7788
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-1744-4981
2017 (English)In: IGLC 2017: Proceedings of the 25th Annual Conference of the International Group for Lean Construction 2017 / [ed] Brilakis I.,Walsh K.,Sacks R., The International Group for Lean Construction , 2017, p. 523-530Conference paper, Published paper (Refereed)
Abstract [en]

Several methods exist for design management such as Agile project management, the Last Planner System®, and configuration in diverse variants. Construction can be realized using different degrees of pre-engineering i.e. different production strategies, which can affect the design management method. The research aim is to describe different design management methods and discuss their capacity to function in existing production strategies in construction. Data was collected as secondary data from earlier publications on Agile project management, the Last Planner® system, configuration, and visual planning. Agile project management has a strong focus on customer value and lends itself well to situations with little pre-engineering. The Last Planner System® in design has a strong focus on the co-creation of flow and coordination of actions. In industrialised housing a dialect of Last Planner System® named KI-VP is implemented drawing upon predefinition of design tasks through standardized work. Configuration is the ultimate predefined design stage, where everything can be automated based on product variants.

Place, publisher, year, edition, pages
The International Group for Lean Construction , 2017. p. 523-530
National Category
Building Technologies Construction Management
Research subject
Timber Structures; Construction Engineering and Management
Identifiers
URN: urn:nbn:se:ltu:diva-65884DOI: 10.24928/2017/0107Scopus ID: 2-s2.0-85029585650OAI: oai:DiVA.org:ltu-65884DiVA, id: diva2:1145769
Conference
25th Annual Conference of the International Group for Lean Construction, IGLC 2017, Hersonissos, Crete, Greece, 9-12 July 2017
Available from: 2017-09-29 Created: 2017-09-29 Last updated: 2018-08-07Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Lidelöw, HelenaJansson, Gustav

Search in DiVA

By author/editor
Lidelöw, HelenaJansson, Gustav
By organisation
Industrilized and sustainable construction
Building TechnologiesConstruction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 249 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf