Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Flow-Oriented Contracting in Industrialized House-Building
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-1744-4981
2017 (English)In: ICCREM 2016: BIM Application and Offsite Construction - Proceedings of the 2016 International Conference on Construction and Real Estate Management 2016 / [ed] Wang Y.,Al-Hussein M.,Shen G.Q.P.,Zhu Y., Reston, VA: American Society of Civil Engineers (ASCE), 2017, 111-116 p.Conference paper, Published paper (Refereed)
Abstract [en]

Industrialized house-builders in Scandinavia, using prefabrication of timber frame modules, have developed platforms to manage design, off-site production and on-site assembly within flow oriented organizations. A whole sales commitment gives time, cost, and quality benefits for house-building companies and also a clear product offer to clients. To meet the contracting and design process within the variety of clients, standardized procurement processes are developed to meet both internal production flow parameters and external demands, from clients and local planning authorities. The study of a flow oriented contracting process shows how industrialized house production parameters and end customer demands could be combined in contracting phase with clients and local planning officers. The study also describes how industrialized house-builders could communicate internally future projects into a flow oriented process by visualizing demand parameters for each project that meet or deviates from platform variables.

Place, publisher, year, edition, pages
Reston, VA: American Society of Civil Engineers (ASCE), 2017. 111-116 p.
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
URN: urn:nbn:se:ltu:diva-65887DOI: 10.1061/9780784480274.014Scopus ID: 2-s2.0-85029597305ISBN: 9780784480274 (print)OAI: oai:DiVA.org:ltu-65887DiVA: diva2:1145799
Conference
2016 International Conference on Construction and Real Estate Management, ICCREM 2016, Edmonton, Canada, 29 September - 1 October 2016
Available from: 2017-09-29 Created: 2017-09-29 Last updated: 2017-11-24Bibliographically approved

Open Access in DiVA

No full text

Other links

Publisher's full textScopus

Search in DiVA

By author/editor
Jansson, Gustav
By organisation
Industrilized and sustainable construction
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 51 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf