Effektivisering av badrumsproduktion i en industrialiserad bostadsfabrik: En jämförelse och rekommendation av Lean-effektivisering och inköp av prefabricerade badrumsgolv- och moduler
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Architecture and Water.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Architecture and Water.
2018 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesisAlternative title
Streamlining the bathroom production in an industrialized housing factory : A comparison and recommendation of Lean efficiency and purchase of prefabricated bathroom floors- and modules (English)
Abstract [sv]

Syfte: Att mäta och kartlägga produktionen i en industrialiserad bostadsfabrik samt mäta effektiviteten av dess badrumstillverkning. Den erhållna informationen används vidare som grund för effektiviseringsförslag presenterade för fabriksledningen. Lösningsförslagen är fördefinierade som ”Förbättring av befintlig produktion med hjälp av Lean”, ”Produktion med förtillverkat badrumsgolv” och ”Produktion med förtillverkade badrumsmoduler”.

Metod: Mätmetoden som användes vid fabriken är en frekvensstudie (WSM), anpassad efter fallstudiens behov. Mätteknikern går med jämnt tidsintervall till arbetsstationer och antecknar vilken aktivitet som pågår i samma sekund. Efter flera tusen upprepningar skapas en genomsnittlig aktivitetsbild över fabrikens badrumsproduktion.

Vidare bearbetas informationen för att erhålla visuella grafer där problem lättare kan identifieras. När problemen fastställts kan lösningsförslagen tas fram och presenteras. 

Resultat: Genom att implementera förtillverkade badrumsgolv- eller modul går det att korta badrummens ledtid samt öka hela fabrikens produktionskapacitet. Vidare eliminerar dessa lösningsförslag även kompetenskrävande arbetsmoment, vilket underlättar personalersättning vid exempelvis sjukdom. 

Implikationer: De i studien framkomna resultaten antyder att företag lidande av växtvärk har stora möjligheter att omstrukturera och avlasta sin produktion, på så vis att en högre produktionskapacitet erhålls. I detta fall kan produktionskapaciteten utökas på tre olika sätt med olika effektivitetsgrad.

Fallstudien kan dock inte svara på exakt i vilken grad effektivitet kan uppnås utan dessa lösningsförslag bör simuleras för att kunna svara på detta. Potential för vidare forskning finns där fallstudien undersöker hur dessa lösningsförslag påverkar fabrikens helhet.

Begränsningar: Storleken och komplexiteten i den beaktade fabriksstrukturen begränsade fallstudien från att analysera fabrikens helhet. Avgränsningar behövde göras vid badrumsproduktionen och produktionen av vissa element i badrummen behövde försummas för att författarna rimligen skulle kunna klara av arbetet.

Abstract [en]

Purpose: To measure and map out the production of an industrialized housing factory, in addition to measure the effectiveness of its bathroom production. The gathered information is then used as foundation for the efficiency improvement proposal presented for the board of directors. The efficiency improvement proposals are predefined as “Improvement of existing production using Lean”, “Production with prefabricated bathroom floors” and “Production with prefabricated bathroom modules”.

Method: The measurement method used at the factory was a frequency study called Work Sampling Method (WSM), adjusted after the case study’s needs. The measurement technician goes with regular intervals to workstations and notes the activity happening in that same moment. After several thousand recurrences, an average activity image can be derived from the data depicting the bathroom production. Furthermore, the data is processed to obtain visual graphs where problems become more distinguishable. When the problems are identified, solutions and propositions can be developed and presented.

Findings: By implementing prefabricated bathroom floors- or modules the factory can reduce its production time and thereby increase the factories production capacity. Furthermore, the propositions and solutions eliminate competence-required operations within the factory. Thereby facilitates the staff replacement..

Implications: The study shows that companies suffering from growing pain have considerable facilities to restructure and relieve its production, in such a way that a higher production capacity is obtained. The production capacity in this case can be expanded by three different methods with various degrees of efficiency. The case study can however not determine the exact degree of efficiency, to obtain these the propositions should be simulated. Further potential research should be done on how the case studies propositions affect the whole of the factory.

Limitations: The size and complexity of the observed factory structure limited the case study from analyzing the whole of the factory. Delimitations had to be done at the bathroom production and the production of certain elements involved in the bathroom production had to be neglected.

Place, publisher, year, edition, pages
2018. , p. 137
Keywords [en]
Lean production, frequency study, prefabricated bathroom floors, prefabricated bathroom modules, production efficiency, resource efficiency, flow efficiency
Keywords [sv]
Lean production, frekvensstudie, förtillverkade badrumsgolv, förtillverkade badrumsmoduler, produktionseffektivisering, resurseffektivitet, flödeseffektivitet.
National Category
Construction Management Production Engineering, Human Work Science and Ergonomics Building Technologies
Identifiers
URN: urn:nbn:se:ltu:diva-68632OAI: oai:DiVA.org:ltu-68632DiVA, id: diva2:1203918
Educational program
Architectural Engineering, master's level
Presentation
2018-03-28, F436, Universitetsvägen 1, Luleå, 10:15 (Swedish)
Supervisors
Examiners
Available from: 2018-05-23 Created: 2018-05-04 Last updated: 2018-05-23Bibliographically approved

Open Access in DiVA

fulltext(3254 kB)13 downloads
File information
File name FULLTEXT01.pdfFile size 3254 kBChecksum SHA-512
5407f7754afde65c88e0b859c7a8b590d0c0dd379e776fc42bda62ce4c25e45b683c4d81beee192d8b7c569a8f37e17482b7333293a6d13608690a4d14cbb178
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Kuna, RobertBidros, David
By organisation
Architecture and Water
Construction ManagementProduction Engineering, Human Work Science and ErgonomicsBuilding Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 13 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 61 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf