A predictive environmental assessment method for construction operations: Application to a Northeast China case study
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction. Department of Construction Management, Harbin Institute of Technology, Harbin, 150001, China.ORCID iD: 0000-0002-9310-9093
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-4695-5369
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-5661-5237
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Fire Engineering. Department of Construction Management, Harbin Institute of Technology, Harbin, 150001, China.
Show others and affiliations
2018 (English)In: Sustainability, ISSN 2071-1050, E-ISSN 2071-1050, Vol. 10, no 11, article id 3868Article in journal (Refereed) Published
Abstract [en]

Construction accounts for a considerable number of environmental impacts, especially in countries with rapid urbanization. A predictive environmental assessment method enables a comparison of alternatives in construction operations to mitigate these environmental impacts. Process-based life cycle assessment (pLCA), which is the most widely applied environmental assessment method, requires lots of detailed process information to evaluate. However, a construction project usually operates in uncertain and dynamic project environments, and capturing such process information represents a critical challenge for pLCA. Discrete event simulation (DES) provides an opportunity to include uncertainty and capture the dynamic environments of construction operations. This study proposes a predictive assessment method that integrates DES and pLCA (DES-pLCA) to evaluate the environmental impact of on-site construction operations and supply chains. The DES feeds pLCA with process information that considers the uncertain and dynamic environments of construction, while pLCA guides the comprehensive procedure of environmental assessment. A DES-pLCA prototype was developed and implemented in a case study of an 18-storey building in Northeast China. The results showed that the biggest impact variations on the global warming potential (GWP), acidification potential (AP), eutrophication (EP), photochemical ozone creation potential (POCP), abiotic depletion potential (ADP), and human toxicity potential (HTP) were 5.1%, 4.1%, 4.1%, 4.7%, 0.3%, and 5.9%, respectively, due to uncertain and dynamic factors. Based on the proposed method, an average impact reduction can be achieved for these six indictors of 2.5%, 21.7%, 8.2%, 4.8%, 32.5%, and 0.9%, respectively. The method also revealed that the material wastage rate of formwork installation was the most crucial managing factor that influences global warming performance. The method can support contractors in the development and management of environmentally friendly construction operations that consider the effects of uncertainty and dynamics.

Place, publisher, year, edition, pages
MDPI, 2018. Vol. 10, no 11, article id 3868
Keywords [en]
environmental impacts, construction process simulation, process-based life cycle assessment, construction operations, supply chain
National Category
Infrastructure Engineering Construction Management
Research subject
Structural Engineering; Construction Management and Building Technology
Identifiers
URN: urn:nbn:se:ltu:diva-71690DOI: 10.3390/su10113868ISI: 000451531700042Scopus ID: 2-s2.0-85055572047OAI: oai:DiVA.org:ltu-71690DiVA, id: diva2:1264925
Note

Validerad;2018;Nivå 2;2018-11-21 (jochin) 

Available from: 2018-11-21 Created: 2018-11-21 Last updated: 2019-02-27Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records BETA

Feng, KailunLu, WeizhuoOlofsson, ThomasChen, Shiwei

Search in DiVA

By author/editor
Feng, KailunLu, WeizhuoOlofsson, ThomasChen, Shiwei
By organisation
Industrilized and sustainable constructionStructural and Fire Engineering
In the same journal
Sustainability
Infrastructure EngineeringConstruction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 90 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf