Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Assessing Digital Information Management Between Design and Production in Industrialised House-Building – A Case Study
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0001-6416-1717
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-2699-2533
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0003-4843-8936
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Industrilized and sustainable construction.ORCID iD: 0000-0002-1744-4981
Show others and affiliations
2019 (English)In: Proceedings of the 36th International Symposium on Automation and Robotics in Construction (ISARC 2019), The International Association for Automation and Robotics in Construction (I.A.A.R.C.) , 2019, p. 340-347Conference paper, Published paper (Refereed)
Abstract [en]

Managing digital information in construction is commonly described through Building Information Modelling (BIM), which advocates seamless chains of information, increased coordination between different actors and a life-cycle perspective on information management. However, low adoption outside the design phase entails that handling information in production is in many cases manual and paper-based, which increases vulnerability for upstream errors materialising downstream in production. Furthermore, issues with interoperability surround many areas when managing digital information. For industrialised house-builders, the transmitter and receiver of information are in many cases integrated within the same company or based on long-term collaboration. This affects their ability to manage information and utilise design information, which implies that their strategy for digital information management (DIM) might benefit from being addressed differently compared to more traditional BIM-based approaches. In this paper, we describe and discuss an implemented DIM-solution at an industrialised house-builder in order to address the benefits and challenges with DIM when managing information from design to production. The results imply that in order for several different functions within the company to reap benefits, a customised DIM-solution adapted after the company's specific needs is a well-suited approach forward to avoid sacrificing functionality when utilising design information.

Place, publisher, year, edition, pages
The International Association for Automation and Robotics in Construction (I.A.A.R.C.) , 2019. p. 340-347
Keywords [en]
Digital Information Management, Industrialised house-building, Information utilisation, Tailored interoperability, Building Information Modelling
National Category
Construction Management
Research subject
Construction Management and Building Technology
Identifiers
URN: urn:nbn:se:ltu:diva-76276DOI: 10.22260/ISARC2019/0046Scopus ID: 2-s2.0-85071413756OAI: oai:DiVA.org:ltu-76276DiVA, id: diva2:1358580
Conference
36th International Symposium on Automation and Robotics in Construction (ISARC 2019), 21-24 May, 2019, Banff, Alberta, Canada
Note

ISBN för värdpublikation: 978-952-69524-0-6

Available from: 2019-10-08 Created: 2019-10-08 Last updated: 2023-09-05Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Eriksson, HenrikSandberg, MarcusMukkavaara, JaniJansson, GustavStehn, Lars

Search in DiVA

By author/editor
Eriksson, HenrikSandberg, MarcusMukkavaara, JaniJansson, GustavStehn, Lars
By organisation
Industrilized and sustainable construction
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 1111 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf