System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Reserve Fleet Indexed To Exogenous Cost Variables
Centre for Mechanical Engineering, University of Coimbra, Portugal.
Centre for Mechanical Engineering, University of Coimbra, Portugal.
Dept of Mechanical Engineering, Faculty Engineering University Porto, Portugal.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0002-4107-0991
2019 (English)In: Transport, ISSN 1648-4142, E-ISSN 1648-3480, Vol. 34, no 4, p. 437-454Article in journal (Refereed) Published
Abstract [en]

Identifying the optimal time to replace a passenger bus in a buses fleet has implications on the size of the reserve fleet. Such calculations rest on endogenous and exogenous economic variables: the former include operating and maintenance costs and bus depreciation; the latter include market imponderables such as the inflation and real discount rates, as well as energy costs, particularly fuel. The authors have created models for the withdrawal/replacement of buses using endogenous economic variables. The models include standard econometric models reflecting the influence of maintenance policies, especially Condition Monitoring (CM) or predictive maintenance, and the size of the reserve fleet. The paper deals with exogenous economic variables, specifically the influence of the cost of money, the inflation and real discount rates rate and the cost of fuel. Both variables fluctuate over time. The paper proposes analytical models for determining the influence of those variables on the withdrawal time and the size of the reserve fleet. It then comprehensively summarizes the variables in a global model, showing its relevance to the dimensioning of the reserve fleet and the withdrawal time.

Place, publisher, year, edition, pages
VGTU Press , 2019. Vol. 34, no 4, p. 437-454
Keywords [en]
life cycle cost (LCC), reserve fleet, maintenance, econometric models, economic life, lifespan
National Category
Other Civil Engineering
Research subject
Operation and Maintenance
Identifiers
URN: urn:nbn:se:ltu:diva-76627DOI: 10.3846/transport.2019.11079ISI: 000490556400003Scopus ID: 2-s2.0-85075739134OAI: oai:DiVA.org:ltu-76627DiVA, id: diva2:1368203
Note

Validerad;2019;Nivå 2;2019-11-06 (johcin)

Available from: 2019-11-06 Created: 2019-11-06 Last updated: 2019-12-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Galar, Diego

Search in DiVA

By author/editor
Galar, Diego
By organisation
Operation, Maintenance and Acoustics
In the same journal
Transport
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 16 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf