System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Automatic closed-loop scheduling in underground mining using discrete event simulation
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.ORCID iD: 0000-0002-7334-4934
Division of Decision and Control Systems, School of Electrical Engineering and Computer Science, KTH Royal Institute of Technology, Stockholm, Sweden; ABB Corporate Research Center, Vasterás, Sweden.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering. SimMine, Malá, Sweden.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.ORCID iD: 0000-0002-2306-9241
Show others and affiliations
2021 (English)In: Journal of the Southern African Institute of Mining and Metallurgy, ISSN 2225-6253, E-ISSN 2411-9717, Vol. 121, no 6, p. 277-282Article in journal (Refereed) Published
Abstract [en]

Today's mining operations require fast reporting and rapid rescheduling based on updated information. An automatic mine scheduling system could not only quickly reschedule but also propose alternative solutions. To avoid the financial and physical risks associated with testing such a system directly in operation, it could be first evaluated via discrete event simulation models. This would offer a safe environment to evaluate different operating rules and algorithms. In this study, this is achieved by integrating automatic scheduling software with a discrete event simulation model.

Place, publisher, year, edition, pages
South African Institute of Mining and Metallurgy, 2021. Vol. 121, no 6, p. 277-282
Keywords [en]
discrete event simulation, production planning, scheduling system, underground mining
National Category
Mineral and Mine Engineering
Research subject
Mining and Rock Engineering
Identifiers
URN: urn:nbn:se:ltu:diva-86824DOI: 10.17159/2411-9717/679/2021ISI: 000684541700002Scopus ID: 2-s2.0-85113396616OAI: oai:DiVA.org:ltu-86824DiVA, id: diva2:1587918
Note

Validerad;2021;Nivå 2;2021-09-01 (alebob)

Available from: 2021-08-26 Created: 2021-08-26 Last updated: 2024-02-16Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Skawina, BartlomiejSundqvist, FredrikGreberg, Jenny

Search in DiVA

By author/editor
Skawina, BartlomiejSundqvist, FredrikGreberg, Jenny
By organisation
Mining and Geotechnical Engineering
In the same journal
Journal of the Southern African Institute of Mining and Metallurgy
Mineral and Mine Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 209 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf