Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Validating the Real-Time Performance of Distributed Energy Resources Participating on Primary Frequency Reserves
Department of Electrical Engineering and Automation, School of Electrical Engineering, Aalto University, FI-00076 Espoo, Finland.
Department of Electrical Engineering and Automation, School of Electrical Engineering, Aalto University, FI-00076 Espoo, Finland.
Luleå University of Technology, Department of Computer Science, Electrical and Space Engineering, Computer Science. Department of Electrical Engineering and Automation, School of Electrical Engineering, Aalto University, FI-00076 Espoo, Finland; International Research Laboratory of Computer Technologies, ITMO University, 197101 St. Petersburg, Russia .ORCID iD: 0000-0002-9315-9920
2021 (English)In: Energies, E-ISSN 1996-1073, Vol. 14, no 21Article in journal (Refereed) Published
Abstract [en]

A significant body of research has emerged for adapting diverse intelligent distributed energy resources to provide primary frequency reserves (PFR). However, such works are usually vague about the technical specifications for PFR. Industrial practitioners designing systems for PFR markets must pre-qualify their PFR resources against the specifications of the market operator, which is usually a transmission system operator (TSO) or independent system operator (ISO). TSO and ISO requirements for PFR have been underspecified with respect to real-time performance, but as fossil-fuel based PFR is being replaced by various distributed energy resources, these requirements are being tightened. The TSOs of Denmark, Finland, Norway, and Sweden have recently released a joint pilot phase specification with novel requirements on the dynamic performance of PFR resources. This paper presents an automated procedure for performing the pre-qualification procedure against this specification. The procedure is generic and has been demonstrated with a testbed of light emitting diode (LED) lights. The implications of low bandwidth Internet of Things communications, as well as the need to avoid abrupt control actions that irritate human users, have been investigated in the automated procedure.

Place, publisher, year, edition, pages
MDPI, 2021. Vol. 14, no 21
Keywords [en]
aggregator, primary frequency reserve, LED lighting, demand response, NarrowBand-Internet of Things (NB-IoT), ancillary service
National Category
Computer Sciences
Research subject
Dependable Communication and Computation Systems
Identifiers
URN: urn:nbn:se:ltu:diva-88305DOI: 10.3390/en14216914ISI: 000726599700001Scopus ID: 2-s2.0-85121431091OAI: oai:DiVA.org:ltu-88305DiVA, id: diva2:1619199
Note

Validerad;2022;Nivå 2;2022-01-01 (johcin)

Available from: 2021-12-13 Created: 2021-12-13 Last updated: 2023-08-28Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Vyatkin, Valeriy

Search in DiVA

By author/editor
Vyatkin, Valeriy
By organisation
Computer Science
In the same journal
Energies
Computer Sciences

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 22 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf