Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Optimization of Railway tamping scheduling
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0001-5785-1242
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0001-7083-4009
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.ORCID iD: 0000-0002-7272-0352
(English)Manuscript (preprint) (Other academic)
Abstract [en]

This research is devoted to optimizing opportunistic tamping scheduling to present a practical and cost-effective approach that considers both preventive and corrective tamping activities. To accomplish this, we formulated the track geometry tamping scheduling problem as a mixed integer linear programming (MILP) model and employed a genetic algorithm for its resolution. Key track quality indicators, including the standard deviation of the longitudinal level and single defects in each segment, were considered.

We developed predictive models for the evolution of standard deviation and single defects over time, which were utilized to schedule preventive tamping activities and anticipate potential corrective actions. Additionally, we investigated the impact of both preventive and corrective tamping activities on the values of standard deviation and single defects.

A case study on data from the Main Western Line in Sweden demonstrated that the fixed cost for occupying each maintenance window significantly influenced the total tamping cost. Moreover, the maintenance cycle interval notably affected the number of required corrective tamping activities. Specifically, a 3-month interval led to over 50% fewer corrective tamping activities compared to a 9-month interval. The results revealed that a 6-month interval struck a favorable balance between corrective and preventive tamping activities and the total cost for our case study.

Keywords [en]
Railway tracks, Track geometry degradation, Maintenance, Optimal tamping scheduling, Track geometry modeling, Track geometry measurements alignment
National Category
Transport Systems and Logistics
Identifiers
URN: urn:nbn:se:ltu:diva-101554OAI: oai:DiVA.org:ltu-101554DiVA, id: diva2:1802146
Available from: 2023-10-03 Created: 2023-10-03 Last updated: 2024-03-22
In thesis
1. Leveraging Data-Driven and Alignment Techniques for Optimal Railway Track Maintenance Scheduling
Open this publication in new window or tab >>Leveraging Data-Driven and Alignment Techniques for Optimal Railway Track Maintenance Scheduling
2023 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

The railway infrastructure plays a pivotal role in fostering economic growth and poverty alleviation. Over time, these infrastructures deteriorate due to aging and usage, compromising their functionality. Given their crucial socioeconomic significance and vast scale, ensuring their functionality and availability is paramount. Thus, an effective condition-based maintenance program is essential to restore reliability, facilitate cost-effective restoration, and enable continued benefits.

Track is a critical railway component susceptible to degradation from traffic loading, resulting in deviations from designated geometry parameters. Such degradation jeopardizes safety, availability, and travel quality. Developing an effective tamping regime emerges as a vital maintenance measure to control degradation and restore track geometry to acceptable standards. An optimal maintenance schedule becomes imperative to minimize costs, enhance track availability and capacity, and ensure safety.

Achieving efficient tamping scheduling necessitates accurate prediction of geometry degradation, accounting for tamping effects, and modeling the evolution of single defects. However, uncontrolled shifts in geometry measurements from different inspections—known as positional errors—can misplace defects and distort their evolution analysis. Therefore, precise alignment of geometry measurements is vital to eliminate such positional errors.

The purpose of this research was to streamline maintenance scheduling through leveraging track geometry measurements for modeling and prediction. Firstly, a study addressed alignment through evaluating and comparing four methods—Cross-Correlation Function (CCF), Recursive alignment by fast Fourier transform (RAFFT), Correlation optimized warping (COW), and Dynamic Time Warping (DTW). Furthermore, a combined RAFFT-COW method was proposed, overcoming their limitations. Comparison revealed COW aligned datasets satisfactorily without altering their shape but could not align endpoints precisely. The combined method effectively aligned datasets even when the datasets were stretched or compressed. Secondly, a modified COW (MCOW) addressed accurate and efficient alignment. MCOW surpassed COW's restrictions and reduced alignment time. To enhance robustness, MCOW with channel fusion (MFCOW) combined data from different channels, significantly reducing positional errors. Thirdly, a multi-objective approach proposed aimed at reducing positional errors in geometry measurements of track as a linear asset. Accordingly, recursive segment-wise peak alignment (RSPA) and MCOW were evaluated and compared. Furthermore, a novel rule-based approach proposed which prevented data loss during alignment, preserving all the single defects. In addition, the results revealed that RSPA excelled in aligning peaks, while MCOW proved efficient for datasets with equal priority data points.

Finally, an optimization model minimized track geometry maintenance costs through tamping scheduling. Key track quality indicators, including the standard deviation of the longitudinal level and single defects and the impact of preventive/corrective tamping on these indicators were integrated. Results showcased the influence of fixed maintenance window costs and maintenance cycle intervals on tamping expenses. The model's validity was confirmed through interactions with experienced practitioners from prominent railway infrastructure and maintenance entities.

Place, publisher, year, edition, pages
Luleå: Luleå University of Technology, 2023
Series
Doctoral thesis / Luleå University of Technology 1 jan 1997 → …, ISSN 1402-1544
Keywords
Railway tracks, degradation, maintenance, tamping, track geometry, planning and scheduling, alignment
National Category
Transport Systems and Logistics
Research subject
Operation and Maintenance Engineering
Identifiers
urn:nbn:se:ltu:diva-101556 (URN)978-91-8048-389-6 (ISBN)978-91-8048-390-2 (ISBN)
Public defence
2023-12-20, C305, Luleå tekniska universitet, Luleå, 10:00 (English)
Opponent
Supervisors
Available from: 2023-10-04 Created: 2023-10-03 Last updated: 2023-11-29Bibliographically approved

Open Access in DiVA

No full text in DiVA

Authority records

Khosravi, MahdiAhmadi, AlirezaKasraei, AhmadNissen, Arne

Search in DiVA

By author/editor
Khosravi, MahdiAhmadi, AlirezaKasraei, AhmadNissen, Arne
By organisation
Operation, Maintenance and Acoustics
Transport Systems and Logistics

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 112 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf