Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Clients' goals and the construction project management process
Chalmers University of Technology, Göteborg, Sweden.
Luleå University of Technology.
2007 (English)In: Facilities, ISSN 0263-2772, E-ISSN 1758-7131, Vol. 25, no 3/4, p. 147-156Article in journal (Refereed) Published
Abstract [en]

Purpose – The paper seeks to suggest methods that will enable innovative and effective communication and collaboration between clients and construction project management professionals. Design/methodology/approach – The methodology involves workshops with construction clients documented in working documents circulated to participants. Findings – Workshops revealed trends that urge a re-evaluation of the briefing process. The need for better briefing with the focus on end-users is increasing. The findings also pointed to difficulties for construction projects to deliver what the user-clients need. There was considered to be a lack of systems and methods to keep track of user client demands sufficiently and in a satisfactory way. Goals need to be iterated and validated on a regular and coherent basis throughout projects. An increased interest for process-oriented and strategic briefing was indicated. Research limitations/implications – Further studies are required to develop a client/user driven construction process that is more than just new statements. Research needs to address not only issues in the business as such, but also what requirements should be put on the education and training of stakeholders who are active in the construction sector. Practical implications – The paper presents a challenge to the traditional role of several actors; there is a need to communicate core business needs to construction prerequisites in a reciprocal way. There is a need of choosing logic – however, this does not diminish the need for methodologies for capturing, processing and verifying requirements in the process of provision of facilities to a user. Originality/value – The paper proposes the idea that different logics govern actions by construction industry stakeholders, an issue the construction sector needs to address.

Place, publisher, year, edition, pages
2007. Vol. 25, no 3/4, p. 147-156
National Category
Construction Management
Research subject
Construction Engineering and Management
Identifiers
URN: urn:nbn:se:ltu:diva-3782DOI: 10.1108/02632770710729737ISI: 000210814200006Scopus ID: 2-s2.0-33847288749Local ID: 19d04eb0-6b50-11dc-9e58-000ea68e967bOAI: oai:DiVA.org:ltu-3782DiVA, id: diva2:976643
Note

Validerad; 2007; 20070925 (pafi)

Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2025-02-05Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Ryd, Nina

Search in DiVA

By author/editor
Ryd, Nina
By organisation
Luleå University of Technology
In the same journal
Facilities
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 1017 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf