Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
A methodology for the implementation of production assurance programmes in production plants
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Operation, Maintenance and Acoustics.
University of Stavanger.
2008 (English)In: Journal of Risk and Reliability, ISSN 1748-006X, E-ISSN 1748-0078, Vol. 222, no 3, p. 283-290Article in journal (Refereed) Published
Abstract [en]

There is an increased use of production assurance programmes in various industries, especially in the petroleum sector. The programme describes the production assurance activities necessary to fulfil the objectives, how they will be carried out, by whom, and when. The activities provide input to decisions regarding concept, design, manufacturing, construction, installation, operation, and maintenance. However, production assurance programmes have not yet been sufficiently developed for general use. It is a challenge to implement and apply such programmes in a practical setting. There is a lack of implementation guidelines. The purpose of the current paper is to meet these challenges; the paper describes and discusses a methodology that facilitates implementation of production assurance programmes in a production plant. The starting point is the offshore oil and gas industry, but the methodology and discussion are to a large extent general and could also be applied in other industries.

Place, publisher, year, edition, pages
2008. Vol. 222, no 3, p. 283-290
National Category
Other Civil Engineering
Research subject
Operation and Maintenance
Identifiers
URN: urn:nbn:se:ltu:diva-5434DOI: 10.1243/1748006XJRR105Scopus ID: 2-s2.0-84993790685Local ID: 388817b0-c843-11dd-941d-000ea68e967bOAI: oai:DiVA.org:ltu-5434DiVA, id: diva2:978308
Note
Validerad; 2008; 20081212 (ysko)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-07-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records BETA

Barabady, Javad

Search in DiVA

By author/editor
Barabady, Javad
By organisation
Operation, Maintenance and Acoustics
In the same journal
Journal of Risk and Reliability
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 64 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf