Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Economic lot scheduling problems incorporating a cost of using the production facility
Luleå University of Technology, Department of Business Administration, Technology and Social Sciences, Business Administration and Industrial Engineering.ORCID iD: 0000-0002-1173-6713
2009 (English)In: International Journal of Production Research, ISSN 0020-7543, E-ISSN 1366-588X, Vol. 47, no 13, p. 3611-3624Article in journal (Refereed) Published
Abstract [en]

This paper considers scheduling the production of several different items on a single machine with constrained capacity, commonly known as the Economic Lot Scheduling Problem (ELSP). Most traditional approaches for the ELSP consider the sum of the setup cost and inventory holding cost and provide cyclic schedules that minimize this sum. In practice, there are not only costs for setups and inventory holding, but also costs for operating the production facility due to e.g. electricity, service, maintenance, tools, operators etc, which depend on the number of hours the facility is operating per working day. In this paper, we modify the traditional cost function to include not only setup and inventory holding cost but also a time variable cost for operating the production facility. The paper shows it is possible to adapt a previous heuristic procedure to this complemented cost. The model can help to determine cyclic schedules and the number of production hours per working day.

Place, publisher, year, edition, pages
2009. Vol. 47, no 13, p. 3611-3624
National Category
Production Engineering, Human Work Science and Ergonomics
Research subject
Industrial Logistics
Identifiers
URN: urn:nbn:se:ltu:diva-5865DOI: 10.1080/00207540801908076ISI: 000266086800009Scopus ID: 2-s2.0-70449623048Local ID: 40eba7f0-9b8e-11dd-94de-000ea68e967bOAI: oai:DiVA.org:ltu-5865DiVA, id: diva2:978741
Note
Validerad; 2009; 20081016 (keni)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2018-07-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records BETA

Brander, PärSegerstedt, Anders

Search in DiVA

By author/editor
Brander, PärSegerstedt, Anders
By organisation
Business Administration and Industrial Engineering
In the same journal
International Journal of Production Research
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 76 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf