Promoting construction innovation: A public infrastructure client’s adaptation of procurement and project management strategies
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Industriellt och hållbart byggande.ORCID-id: 0000-0002-4291-0462
2025 (engelsk)Doktoravhandling, med artikler (Annet vitenskapelig)
Abstract [en]

The construction and infrastructure sector is a significant contributor to global carbon emissions, necessitating substantial changes to support, what can be called, the sustainability transition. Public infrastructure clients are expected to lead this transition by promoting construction innovation, while engineering consultants, involved in the planning and design of projects, play a key role in supporting these efforts. Public procurement is widely recognized – politically – as a key strategic tool for promoting innovation and advancing sustainability, despite the project-based sector the role of project management remains largely overlooked. However, previous research highlights the importance of both procurement and project management strategies in promoting construction innovation. To effectively promote innovation, these strategies must be adapted to the specific characteristics of each project and should emphasize flexibility and involvement of actors. Despite the procurement and project management strategies’ acknowledged significance, they are often treated as separate governance mechanisms within previous research, failing to account for their interconnected nature.

The purpose of this thesis is to increase the understanding of how a public infrastructure client promotes innovation towards the sustainability transition through adaptation of procurement and project management strategies in planning and design of new infrastructure. A longitudinal single-case study of the largest public infrastructure client in Sweden, the Swedish Transport Administration (Trafikverket), provides empirical insights.

The findings show that despite high expectations for public clients to promote innovation – especially in designated pilot projects – these projects are evaluated and managed through conventional linear processes, short-term goals, and paradigms. While innovation is acknowledged as a multidimensional concept requiring flexibility and collaboration, procurement and project management strategies remain predominantly control-oriented, emphasizing efficiency, problem-solving, and monitoring. This approach is found to limit the perceived promotion and impact of construction innovation in practice.

By problematizing the concept of comprehensive governance – integrating procurement and project management – this thesis highlights how public clients’ reliance on detailed process control and the aligning with a hard paradigm, which is not well-suited to promote construction innovation. The research underscores the interdependence of procurement and project management strategies, advocating for a holistic governance perspective in construction management research and practice. Addressing this interconnection, both within research and practice, is crucial for developing strategies that effectively promotes construction innovation supporting the sustainability transition in public infrastructure projects.

sted, utgiver, år, opplag, sider
Luleå: Luleå tekniska universitet, 2025.
Serie
Doctoral thesis / Luleå University of Technology, ISSN 1402-1544
Emneord [en]
Construction innovation, Engineering consultant, Procurement strategy, Project management strategy, Hard project management, Soft project management, Infrastructure project
HSV kategori
Forskningsprogram
Byggproduktion och byggteknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-112010ISBN: 978-91-8048-791-7 (tryckt)ISBN: 978-91-8048-792-4 (digital)OAI: oai:DiVA.org:ltu-112010DiVA, id: diva2:1944653
Disputas
2025-05-15, E632, Luleå University of Technology, Luleå, 09:00 (svensk)
Opponent
Veileder
Forskningsfinansiär
Swedish Transport Administration, TRV 2022/124463Tilgjengelig fra: 2025-03-14 Laget: 2025-03-14 Sist oppdatert: 2026-10-23bibliografisk kontrollert
Delarbeid
1. Public procurement of engineering services: the influence of task characteristics on organisational control
Åpne denne publikasjonen i ny fane eller vindu >>Public procurement of engineering services: the influence of task characteristics on organisational control
2024 (engelsk)Inngår i: Engineering Construction and Architectural Management, ISSN 0969-9988, E-ISSN 1365-232X, Vol. 31, nr 13, s. 208-222Artikkel i tidsskrift (Fagfellevurdert) Published
sted, utgiver, år, opplag, sider
Emerald Group Publishing Limited, 2024
HSV kategori
Identifikatorer
urn:nbn:se:ltu:diva-95188 (URN)10.1108/ecam-01-2022-0055 (DOI)000820765600001 ()2-s2.0-85133420157 (Scopus ID)
Tilgjengelig fra: 2023-01-09 Laget: 2023-01-09 Sist oppdatert: 2026-03-12bibliografisk kontrollert
2. Adaptability in Public Procurement of Engineering Services Promoting Carbon Reduction: An Organizational Control Perspective
Åpne denne publikasjonen i ny fane eller vindu >>Adaptability in Public Procurement of Engineering Services Promoting Carbon Reduction: An Organizational Control Perspective
2022 (engelsk)Inngår i: Sustainability, E-ISSN 2071-1050, Vol. 14, nr 10, artikkel-id 5958Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Many studies have emphasized the importance of engineering services and their adaptability to reduce carbon emissions in the construction sector. As public clients procure these services, selecting efficient (procurement-related) control modes is critical. However, studies of control modes and their effect on adaptability are scarce. The purpose of this study is to investigate how, through the choice of control modes, a public client may create incentives for service providers to deliver carbon reduction solutions in the construction phase. In this study, a procurement model and a classification model are developed, and a single case study of an engineering service contract aiming for carbon reduction is used to illustrate the models. The empirical data include 16 interviews with respondents from the 2 contract parties, i.e., the client and service provider. The findings show that it is important to create incentives for adaptability when procuring engineering services with the aim of reducing carbon emissions in the construction phase. The findings also highlight the importance of these incentives being created both in relation to the selection of service providers and to the responsibility between the contract parties. The models developed in the study may serve as important tools for both practitioners and researchers. 

sted, utgiver, år, opplag, sider
MDPI, 2022
Emneord
adaptability, carbon emission reduction, construction management, engineering services, incentives, organizational control, public procurement
HSV kategori
Identifikatorer
urn:nbn:se:ltu:diva-95187 (URN)10.3390/su14105958 (DOI)000801326900001 ()2-s2.0-85130788916 (Scopus ID)
Forskningsfinansiär
Swedish Transport Administration, TRV 2019/40476Swedish Transport Administration
Tilgjengelig fra: 2023-01-09 Laget: 2023-01-09 Sist oppdatert: 2026-03-12bibliografisk kontrollert
3. Innovation outcomes and processes in the planning and design phase of a public infrastructure project
Åpne denne publikasjonen i ny fane eller vindu >>Innovation outcomes and processes in the planning and design phase of a public infrastructure project
2025 (engelsk)Inngår i: Construction Innovation, ISSN 1471-4175, E-ISSN 1477-0857, Vol. 25, nr 7, s. 1-22Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Purpose

This purpose of this study is to explore how the public client, the engineering consultant and the sub-consultant perceive and address innovation outcomes and processes in the planning and design phase of infrastructure projects.

Design/methodology/approach

An explorative single-case study of a public infrastructure project was carried out. A multi-dimensional innovation framework, including innovation outcomes and processes, was applied.

Findings

Innovation outcomes in terms of products and processes from the engineering consultant’s work in the planning and design phase hold untapped potential for enhancing innovation in construction projects. Additionally, findings indicate that sub-consultants from outside the construction industry (i.e. external knowledge resources) play a crucial role in introducing more radical innovations based on adaptation.

Originality/value

The findings provide an empirical illustration of a further developed innovation framework that can be used by both scholars and practitioners to analyze and discuss the multi-dimensional concept of innovation in the construction context. Additionally, the findings highlight the importance of capturing perceptions of various actors regarding innovation outcomes and processes to facilitate innovation in an inter-organizational context.

sted, utgiver, år, opplag, sider
Emerald Group Publishing Limited, 2025
Emneord
Construction innovation, Engineering consultant, External knowledge resources, Internal knowledge resources, Innovation as an outcome, Innovation as a process
HSV kategori
Forskningsprogram
Byggproduktion och byggteknik
Identifikatorer
urn:nbn:se:ltu:diva-111816 (URN)10.1108/ci-07-2024-0193 (DOI)001419383000001 ()2-s2.0-85218355932 (Scopus ID)
Forskningsfinansiär
Swedish Transport Administration, TRV 2022/124463
Merknad

Validerad;2025;Nivå 1;2025-03-04 (u4);

Fulltext license: CC BY

Tilgjengelig fra: 2025-03-04 Laget: 2025-03-04 Sist oppdatert: 2025-10-21bibliografisk kontrollert
4. Sustainability transition stuck in the project management paradigm?: Exploring project management in two Swedish infrastructure projects assigned to drive innovation
Åpne denne publikasjonen i ny fane eller vindu >>Sustainability transition stuck in the project management paradigm?: Exploring project management in two Swedish infrastructure projects assigned to drive innovation
(engelsk)Manuskript (preprint) (Annet vitenskapelig)
HSV kategori
Forskningsprogram
Byggproduktion och byggteknik
Identifikatorer
urn:nbn:se:ltu:diva-112009 (URN)
Forskningsfinansiär
Swedish Transport Administration, TRV 2022/124463
Tilgjengelig fra: 2025-03-14 Laget: 2025-03-14 Sist oppdatert: 2025-10-21bibliografisk kontrollert

Open Access i DiVA

fulltext(4215 kB)3 nedlastinger
Filinformasjon
Fil FULLTEXT02.pdfFilstørrelse 4215 kBChecksum SHA-512
dbdf4cdf88835883a823f1e54e6cef72b8cdd442d08b92bd05014e4be507bb153c8eb6445b6e47685b69e69ab80116f91d0ee4aa54731e9c23ed5bd0d932b4c4
Type fulltextMimetype application/pdf

Person

Granheimer, Klara

Søk i DiVA

Av forfatter/redaktør
Granheimer, Klara
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 330 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

isbn
urn-nbn

Altmetric

isbn
urn-nbn
Totalt: 2380 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf