Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Guideline for replacement of elderly rail infrastructure: Deliverable D2.4 of MAINLINE - a project in EC 7th Framework Programme
DB, Deutsche Bahn.
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, Byggkonstruktion och -produktion.ORCID-id: 0000-0002-0560-9355
COMSA.
Trafikverket, Luleå.
Vise andre og tillknytning
2014 (engelsk)Rapport (Annet (populærvitenskap, debatt, mm))
Abstract [en]

This report gives advice on how to choose the most suitable method for bridge and track replacement activities on operational railway networks. It will assist IMs in the evaluation of, and selection from, the wide range of possible replacement methods presented in the previous deliverables from WP3: ML D3.1 (2013) Benchmark; ML D3.2 (2014) Bridges and ML D3.3 (2014) Track.An important consideration in replacing elderly infrastructure within the railway environment is track access since this is the major source of income for railway administrations and can be an important factor in national economics. Consequently it is important to reduce any downtime period by planning and optimizing the construction processes, even though this may lead to somewhat increased investment in terms of labour, temporary solutions and machinery. Here a systematic approach, which should always be connected to life cycle assessment, is extremely important. Hence, the focus of this report is on cost effective and environmentally sound methods that are easy to implement with a low impact on rail traffic through short network down time that will help the IM to decide on the most favourable measures based on technical, social, environmental or cost demands.First the planning process is treated in chapter 4 and Appendix A. Then guidelines are given on bridge replacement in chapter 5 and some examples of standard bridges are presented in Appendix B. Track, Switches and Crossings are presented in Chapter 6. The report also presents a proposal for a rough estimation of track possession costs and related parameters which can be used where no formal method of calculation is used in Appendix C.

sted, utgiver, år, opplag, sider
2014. , s. 121
HSV kategori
Forskningsprogram
Konstruktionsteknik; Attraktivt samhällsbyggande (FOI)
Identifikatorer
URN: urn:nbn:se:ltu:diva-23051Lokal ID: 56cea6e8-9f3e-4dc9-a934-a6e88ecb2b3eOAI: oai:DiVA.org:ltu-23051DiVA, id: diva2:996100
Merknad
Godkänd; 2014; Bibliografisk uppgift: MAINLINE MAINtenance, renewal and Improvement of rail transport iNfrastructure to reduce Economic and environmental impacts Collaborative project (Small or medium-scale focused research project) Theme SST.2011.5.2-6.: Cost-effective improvement of rail transport infrastructure; 20150519 (elfgren)Tilgjengelig fra: 2016-09-29 Laget: 2016-09-29 Sist oppdatert: 2025-10-21bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

http://www.mainline-project.eu/IMG/pdf/ml-d3.4-guideline_for_replacement_of_elderly_infrastructure.pdf

Person

Elfgren, Lennart

Søk i DiVA

Av forfatter/redaktør
Elfgren, Lennart
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 147 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf