Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A practical approach to verification and maintenance procedures for IEC 61850 substations
Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik, Energivetenskap.ORCID-id: 0000-0003-0749-7366
FINGRID Oyj.
Svenska Kraftnät.
2010 (Engelska)Konferensbidrag, Enbart muntlig presentation (Refereegranskat)
Abstract [en]

IEC 61850 standard defines a large smorgasbord of different information models that can be used for safe commissioning and maintenance testing. These functionalities potentially allow for safe testing with the substation still in operation.Over the past two years the Finnish and Swedish TSOs have worked together with an independent test institute and consultancy company on a series of projects to explore the possibilities with IEC 61850 and to develop new commissioning and maintenance test procedures adapted to IEC 61850 systems. The first part of the project aimed to investigate procedures that could be used for site acceptance and maintenance testing. Based on available functionality in the standard an approach was envisioned for commissioning and maintenance. In practise few of the available test, simulation and blocking indications have been consistently implemented in the first generation of IEC 61850 devices. It was therefore necessary to move to a more interoperable (but not standardised) approach described in this paper.With the 2nd edition of the IEC 61850 standard there is a basis for more efficient and standardized testing methods. The finding from the project is that only a subset of the available possibilities for testing in the IEC 61850 standard are normally implemented. More consistent implementation and use of the test related functionality is required. To obtain this, utility and system integrator engineers need to get deeper involved in the definition, implementation, interpretation and use of the various test related information models and enter into active dialogue with the manufacturers of IEDs and test equipment.

Ort, förlag, år, upplaga, sidor
2010.
Nyckelord [en]
IEC 61850, Substation Automation, Testing procedures, Maintenance, IEC 61850, Interoperability, System integration
Nationell ämneskategori
Energiteknik
Forskningsämne
Energiteknik
Identifikatorer
URN: urn:nbn:se:ltu:diva-37786Lokalt ID: be9603a8-5b63-405e-825c-753306e574d5OAI: oai:DiVA.org:ltu-37786DiVA, id: diva2:1011284
Konferens
CIGRE Sessions : 22/08/2010 - 27/08/2010
Anmärkning

Godkänd; 2010; 20120217 (ysko)

Tillgänglig från: 2016-10-03 Skapad: 2016-10-03 Senast uppdaterad: 2025-10-22Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Person

Etherden, Nicholas

Sök vidare i DiVA

Av författaren/redaktören
Etherden, Nicholas
Av organisationen
Energivetenskap
Energiteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 20546 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf