Utformning av arbetssätt för omställningsförbättringar: Framtaget för Sandvik Coromant
2012 (Svenska)Självständigt arbete på avancerad nivå (yrkesexamen), 20 poäng / 30 hpStudentuppsats (Examensarbete)
Abstract [en]

The aim of the thesis was to develop a method to be used to improve changeover work at Sandvik Coromant. The work method was designed for use by production managers and operators, it was introduced to them in a training session. The manufacturing is based on customer orders, and batch sizes vary between 2 and 500 pieces. The small batch implies frequent changeover and a need for short changeover times. The method for changeover was designed to be easy to learn and use.The project work began with two weeks practice together with operators. The close contact with operators was valuable for forthcoming interviews and user participation.We have based our method for changeover work on existing tools and methods. These were modified, adapted and combined to an integrated method. A thorough literature review was performed, from which interesting methods and tools were chosen for further investigation. The number of methods and tools were reduced after evaluation with assistance of a requirement specification, which was designed with criteria established after interviews and observations. The final work method includes value stream mapping, force field analysis, hierarchical task analysis, and single-minute exchange of die. Value stream mapping is used to investigate where in the system an improvement contributes the most to the total productivity. A changeover improvement team is established. They use the force field analysis method to highlight hindering and supporting issues and the SMED method for the detailed development of the improved changeover procedure. The project is carried out intensively with three full days of training and intermediate practical work within a period of 6-9 weeks.The work method was tested and evaluated through a pilot project. The pilot project was conducted live in a real situation in a representative department in the Gimo plant. We took the role as project leader in the pilot project instead of the production manager. Acting as project leader gave valuable feedback on the proposed method and developed training materials. The pilot project was carried out during six weeks and was assessed as successful. Due to the successful pilot project training sessions were also performed with managers and other interested persons.

Ort, förlag, år, upplaga, sidor
2012. , s. 100
Nyckelord [en]
Technology
Nyckelord [sv]
Teknik, SMED, omställningsarbete, brukarmedverkan, ställtid, HTA, VFA, Markus Ström, Jonatan Löthman, omställningstider, participation
Identifikatorer
URN: urn:nbn:se:ltu:diva-51003Lokalt ID: 83b0ff60-a2f6-4bf3-87f0-005004e7399fOAI: oai:DiVA.org:ltu-51003DiVA, id: diva2:1024366
Ämne / kurs
Examensarbete, minst 30 hp
Utbildningsprogram
Civilingenjör, Teknisk design
Handledare
Examinatorer
Anmärkning
Validerat; 20120614 (anonymous)Tillgänglig från: 2016-10-04 Skapad: 2016-10-04 Senast uppdaterad: 2025-10-22Bibliografiskt granskad

Open Access i DiVA

fulltext(7551 kB)528 nedladdningar
Filinformation
Filnamn FULLTEXT02.pdfFilstorlek 7551 kBChecksumma SHA-512
baad28d1a59f12c4f4f6df36fcca6fe5ef3594f59828677d1cc50cc923455a0b3f563c962fe52c076f2aa87504d5ef433336368861a358ec2d20a3d41bd1efb2
Typ fulltextMimetyp application/pdf

Sök vidare i DiVA

Av författaren/redaktören
Löthman, JonatanStröm, Markus

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 529 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 285 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf