This paper relates to building acoustic measurement inside a two-story office house. The construction, which is known as lightweight, is prefabricated in volumes at a factory and is then transported to the building yard for assembling. It is build up of a wooden frame with particle boards and plaster boards attached. The building consists of a number of nominally, or almost nominally, identical rooms with assumed identical sound properties. In the projection stage, the construction was slightly modified in some of the rooms in order to see in what way the sound properties would be affected. In total eight impact sound pressure level measurements and eight sound reduction index measurements were performed and analysed for the different setups.
Godkänd; 2008; Bibliografisk uppgift: Artikeln utgiven i 7th European Conference on Noise Control 2008, EURONOISE 2008, sid 5567-5571, Euronoise CD-ROM proceedings, ISSN 2226-5147; 20080616 (andbra)