Maintenance and Renewal of Concrete Rail Bridges - Results from EC project MAINLINEShow others and affiliations
2014 (English)In: Nordic Concrete Research, ISSN 0800-6377, Vol. 50, p. 25-28Article in journal (Refereed) Published
Abstract [en]
There is a need to extend the life and capacity of many existing railway bridges. One of the objects of the EC-FP7-Project MAINLINE, 2011-2014, is to facilitate this. Guidelines for assessment and strengthening methods are presented as well as case studies in which existing bridges are being studied in order to extend their life length. Case studies on bridges tested to failure in order to calibrate assessment methods are also presented. Fatigue is often a vital question. A Life Cycle Assessment Tool (LCAT) is being prepared to enable Infrastructure Managers to choose optimal maintenance strategies.
Place, publisher, year, edition, pages
Nordic Concrete Federation , 2014. Vol. 50, p. 25-28
Keywords [en]
Aging, Knowledge and Teaching, Modelling, Repair, Structural Design, Sustainable, Testing, Railway bridges, extended life, assessment methods, concrete bridges, strengthening, calibrate model, loading to failure, fatigue, Life Cycle Assessment
National Category
Infrastructure Engineering
Research subject
Structural Engineering; Attractive built environment (AERI)
Identifiers
URN: urn:nbn:se:ltu:diva-37680Local ID: bc5dcd40-5dc2-49de-a7aa-8ad276c767f9OAI: oai:DiVA.org:ltu-37680DiVA, id: diva2:1011178
Conference
Nordic Concrete Research Symposia : 13/08/2014 - 15/08/2014
Projects
Sveriges Bygguniversitet, Centrum för riskanalys och riskhantering, CRR, Mainline-MAINtenance, renewaL and Improvement of rail transport iNfrastructure to reduce Economic and environmental impacts
Note
Godkänd; 2014; 20140820 (jonnil); Konferensartikel i tidskrift
2016-10-032016-10-032025-10-22Bibliographically approved