Drill Monitoring for Rock Mass Assessment in Tunnelling
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Mining and Geotechnical Engineering.ORCID iD: 0000-0003-1923-044x
2020 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

Site investigations for tunnel projects are often unable to determine rock mass conditions accurately for the entire tunnel, as these investigations obtain qualitative data for only limited parts of the tunnel. This is the case at the Stockholm Bypass project in Sweden. At two ramp tunnels, the rock mass was characterised as significantly poorer during the excavation than had been determined previously in the site investigation. In this study, Measurement While Drilling (MWD) technology was employed to characterise the rock mass for grouting purposes using extraction drill monitoring data from the grout holes. In addition, MWD data were extracted from blast holes at the entrance of one access and two ramp tunnels. The MWD data included the penetration rate and feed, percussive, rotation, and water pressure measurements at less than 3cm intervals in the drill holes. The drill rig supplier’s software was able to characterise the rock mass accurately for fracture zones, as shown in a comparison of the fracturing index of grout holes, blast holes, and the mapped

rock mass structures. Since the suppliers’ software packages ignored some essential features of drilling, the study developed an improved MWD data normalisation and filtering process. This new process took the effects of different rock drills and drill rod extensions on the MWD data into account. The new normalisation and filtering process showed the capability to describe the rock mass conditions more accurately

than the current method. A holistic approach was also developed to optimise the rock support process even further. Here, the rock mass was objectively qualified using measured drilling data instead of observations. This process correlated the fracturing index to rock mass quality and rock support requirements. Lastly, a correlation was made between the rock mass quality and the grout requirements per grout umbrella;

these requirements were linked to the rock mass conditions determined by the MWD parameters. Based on these relations, a conceptual grout decision-making model was developed. The study found all-in-all tunnel practices could be improved with the implementation of MWD for rock mass characterisation and as part of a rock mass quality control plan. The MWD technology provides additional information on the rock mass and could be incorporated into the observational method for rock mass excavation.

 

Place, publisher, year, edition, pages
Luleå: Luleå University of Technology, 2020.
Series
Doctoral thesis / Luleå University of Technology, ISSN 1402-1544
National Category
Infrastructure Engineering Other Civil Engineering
Research subject
Mining and Rock Engineering
Identifiers
URN: urn:nbn:se:ltu:diva-80457ISBN: 978-91-7790-630-8 (print)ISBN: 978-91-7790-631-5 (electronic)OAI: oai:DiVA.org:ltu-80457DiVA, id: diva2:1459128
Public defence
2020-10-21, C305, Luleå, 13:00 (English)
Opponent
Available from: 2020-08-20 Created: 2020-08-19 Last updated: 2025-10-22Bibliographically approved
List of papers
1. The History and Future of Rock Mass Characterisation by Drilling in Drifting: From sledgehammer to PC-tablet
Open this publication in new window or tab >>The History and Future of Rock Mass Characterisation by Drilling in Drifting: From sledgehammer to PC-tablet
2017 (English)In: Mine Planning and Equipment Selection (MPES 2017): Proceeding of the 26th International Symposium on Mine Planning and Equipment Selection Luleå, Sweden, August 29-31, 2017 / [ed] Behzad Ghodrati, Uday Kumar, Håkan Schunnesson, Luleå: Luleå tekniska universitet, 2017, p. 99-106Conference paper, Published paper (Refereed)
Abstract [en]

In underground construction projects problematic rock mass conditions are one of the major issues causing cost overruns during the excavation phase. Before a tunneling project starts the rock mass is roughly characterized by a pre-investigation. However, in many cases, these pre-investigation does not portray the rock mass characteristics accurately and do not predict local anomalies in the subsurface. Therefore there is a need for new rock mass characterization methods that can reduce uncertainties and improve the overall tunneling process.

In the end of the 1880s, rock mass characterization based on manual drill data was investigated and rock masses were quantified using drillability. Since then, the technology has significantly changed with the introduction of hydraulic rock drills, computerized drill rigs, and advanced rock mass classification systems based on drill parameters. Nowadays, automatic drill logging systems and drilling data processing software packages are widely available and commonly used in Scandinavian tunneling projects.

This technology uses drilling parameters to characterize the rock mass. However, monitored drill parameters are influenced not only by the variations in the properties of the penetrated rock mass but also by the operator and the rig control system that continuously control the applied forces to optimize drilling and prevent jamming. In order to be useful for geomechanical purposes, the drilling data needs to be filtered, normalized and analyzed to refine the rock related response from responses caused by other influencing factors. If successful the data might be used to determine hardness, fracturing and water indicators.

Even though the technology has shown high potential in laboratory tests and field trials, it is not an obvious choice for all tunneling projects. In this paper, the background of the technology are described and the potential for the future outlined, concluding that the technique probably will be used more extensively in the future. 

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet, 2017
Keywords
Measurement While Drilling, MWD, drilling, rock mass characterization
National Category
Other Mechanical Engineering Mineral and Mine Engineering Other Civil Engineering
Research subject
Mining and Rock Engineering
Identifiers
urn:nbn:se:ltu:diva-68734 (URN)978-91-7583-935-6 (ISBN)978-91-7583-936-3 (ISBN)
Conference
26th International Symposium on Mine Planning and Equipment Selection, Luleå, Sweden, August 29-31, 2017
Available from: 2018-05-15 Created: 2018-05-15 Last updated: 2025-10-22Bibliographically approved
2. Application of Measurement While Drilling Technology to Predict Rock Mass Quality and Rock Support for Tunnelling
Open this publication in new window or tab >>Application of Measurement While Drilling Technology to Predict Rock Mass Quality and Rock Support for Tunnelling
2020 (English)In: Rock Mechanics and Rock Engineering, ISSN 0723-2632, E-ISSN 1434-453X, Vol. 53, no 3, p. 1349-1358Article in journal (Refereed) Published
Abstract [en]

A tunnelling project is normally initiated with a site investigation to determine the in situ rock mass conditions and to generate the basis for the tunnel design and rock support. However, since site investigations often are based on limited information (surface mapping, geophysical profiles, few bore holes, etc.), the estimation of the rock mass conditions may contain inaccuracies, resulting in underestimating the required rock support. The study hypothesised that these inaccuracies could be reduced using Measurement While Drilling (MWD) technology to assist in the decision-making process. A case study of two tunnels in the Stockholm bypass found the rock mass quality was severely overestimated by the site investigation; more than 45% of the investigated sections had a lower rock mass quality than expected. MWD data were recorded in 25 m grout holes and 6 m blast holes. The MWD data were normalised so that the long grout holes with larger hole diameters and the shorter blast holes with smaller hole diameters gave similar results. With normalised MWD data, it was possible to mimic the tunnel contour mapping; results showed good correlation with mapped Q-value and installed rock support. MWD technology can improve the accuracy of forecasting the rock mass ahead of the face. It can bridge the information gap between the early, somewhat uncertain geotechnical site investigation and the geological mapping done after excavation to optimise rock support.

Place, publisher, year, edition, pages
Springer, 2020
Keywords
Measurement while drilling (MWD), Rock mass investigation, Tunnelling, Rock mass quality, Rock support, Drill and blast technology
National Category
Mineral and Mine Engineering Infrastructure Engineering Construction Management Geotechnical Engineering and Engineering Geology Other Civil Engineering
Research subject
Mining and Rock Engineering
Identifiers
urn:nbn:se:ltu:diva-76382 (URN)10.1007/s00603-019-01979-2 (DOI)000489294700001 ()2-s2.0-85074460170 (Scopus ID)
Funder
Rock Engineering Research Foundation (BeFo), 344
Note

Validerad;2020;Nivå 2;2020-04-21 (johcin);

Artikeln har tidigare förekommit som manuskript i avhandling.

Available from: 2019-10-14 Created: 2019-10-14 Last updated: 2026-03-12Bibliographically approved
3. Improved filtering and normalizing of Measurement-While-Drilling (MWD) data in tunnel excavation
Open this publication in new window or tab >>Improved filtering and normalizing of Measurement-While-Drilling (MWD) data in tunnel excavation
2020 (English)In: Tunnelling and Underground Space Technology, ISSN 0886-7798, E-ISSN 1878-4364, Vol. 103, article id 103467Article in journal (Refereed) Published
Abstract [en]

Measurement-While-Drilling (MWD) data are complex because of the drilling process and drilling system. Swift and accurate normalization and filtration processes are required if MWD data are to be used for rock mass characterization. The current method for MWD data filtration does not consider all the effects of the drilling process, e.g., collaring or extension rod coupling. This paper presents a new method for MWD data filtration and normalization. The new method filters the operational parameters and normalizes the data on a stepwise algorithm, including production factors (collaring drill hole and rod extension coupling) and rock drill settings. It shows reliable results for the normalization and filtration of MWD data gathered for drill hole collaring and coupled extension drill rods at grout holes and for different rock drills.

Place, publisher, year, edition, pages
Elsevier, 2020
Keywords
Measurement-While-Drilling (MWD), Filtering, Normalization, Drill and Blast, Tunneling
National Category
Other Civil Engineering
Research subject
Mining and Rock Engineering
Identifiers
urn:nbn:se:ltu:diva-79990 (URN)10.1016/j.tust.2020.103467 (DOI)000556245300023 ()2-s2.0-85086739135 (Scopus ID)
Funder
Rock Engineering Research Foundation (BeFo), 344
Note

Validerad;2020;Nivå 2;2020-09-01 (johcin)

Available from: 2020-06-24 Created: 2020-06-24 Last updated: 2025-10-22Bibliographically approved
4. Rock support prediction based on measurement while drilling technology
Open this publication in new window or tab >>Rock support prediction based on measurement while drilling technology
2021 (English)In: Bulletin of Engineering Geology and the Environment, ISSN 1435-9529, E-ISSN 1435-9537, Vol. 80, no 2, p. 1449-1465Article in journal (Refereed) Published
Abstract [en]

In tunnelling, rock mass support is designed based on the observed rock mass conditions. These conditions are determined by rock mass characterization. Measurement while drilling (MWD), one such characterization method, acquires drill parameter data during drilling. These data can be used to predict rock mass conditions ahead of the face. In this study, grout-hole MWD data are collected at one of the main tunnels in the large infrastructural project Stockholm bypass tunnels. The normalized and filtered MWD data are correlated to the rock mass characteristics using multilinear regression and the Levenberg-Marquardt method. Although a strong numerical correlation cannot be obtained, the results are promising. As a result, a holistic visual approach, which linked the MWD parameters with the rock mass classification and rock support requirements, was developed.

Place, publisher, year, edition, pages
Springer Nature, 2021
Keywords
Measurement while drilling, Rock support, Tunnelling, Rock mass characterization
National Category
Other Civil Engineering
Research subject
Mining and Rock Engineering
Identifiers
urn:nbn:se:ltu:diva-80575 (URN)10.1007/s10064-020-01957-x (DOI)000562086800001 ()2-s2.0-85089652870 (Scopus ID)
Funder
Rock Engineering Research Foundation (BeFo), 344Luleå University of Technology
Note

Validerad;2021;Nivå 2;2021-02-09 (alebob)

Available from: 2020-08-26 Created: 2020-08-26 Last updated: 2025-10-22Bibliographically approved

Open Access in DiVA

fulltext(30354 kB)4042 downloads
File information
File name FULLTEXT01.pdfFile size 30354 kBChecksum SHA-512
2eb3a90bad15429dc53933d4cee460c8e8d0e5c27a4c9eccac8a9ecb351c44a1dff510b080594b25b1ff6d68fd5c6f6f63c294373bce5768484e1b93a3e512ad
Type fulltextMimetype application/pdf

Authority records

van Eldert, Jeroen

Search in DiVA

By author/editor
van Eldert, Jeroen
By organisation
Mining and Geotechnical Engineering
Infrastructure EngineeringOther Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 4088 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 1316 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf