Drivers of cost and time overruns: A client and contractor perspective
Mälardalen University, School of Business, Society and Engineering, P.O. Box 883, SE-721 23, Västerås, Sweden.
Luleå University of Technology, Department of Social Sciences, Technology and Arts, Business Administration and Industrial Engineering.ORCID iD: 0000-0002-9707-7068
2021 (English)In: Organization, Technology and Management in Construction: an International Journal, E-ISSN 1847-6228, Vol. 13, no 1, p. 2374-2382Article in journal (Refereed) Published
Abstract [en]

Large infrastructure investments are expected to be of sustained value to society for a long time. Such investment projects include, for instance, hospitals, tunnels, sport arenas, power plants, roads, railways, and bridges. They involve a complex organization of contracts and agreements. The client is expected to plan, procure, and determine the critical steps of a project, while the contractor should solve issues raised by the client. Many of these agreements are path-dependent and reflect past routines, experiences, and contacts. As such, many investments tend to return to similar sources instead of replacing routines and collaborations that did not work. This can cause change orders that furthermore reflect consequences such as cost and time overruns. While much is known about these effects in construction projects, this paper sheds light on the drivers of change orders. We build upon a sample of 234 observations responding to a survey on investment planning. The results show that project assumptions are often wrong and inadequate in large investments. Such wrong assumptions are caused by interpersonal and leadership issues, poor planning, or sometimes even intentional profit-seeking. Our results show that clients and contractors have different perceptions and enter contractual obligations differently. The implication is, therefore, that better routines of documentation, more frequent feedback, and more accurate or precise standards may close the gap between planning and what is actually achieved. More precise contractual agreements may also create a better process to procure, manage projects, and allocate resources. 

Place, publisher, year, edition, pages
Walter de Gruyter, 2021. Vol. 13, no 1, p. 2374-2382
Keywords [en]
investment projects, change orders, cost and time overrun, client–contractor differences
National Category
Business Administration
Research subject
Accounting and Control
Identifiers
URN: urn:nbn:se:ltu:diva-84579DOI: 10.2478/otmcj-2021-0006Scopus ID: 2-s2.0-85106994622OAI: oai:DiVA.org:ltu-84579DiVA, id: diva2:1556267
Note

Validerad;2021;Nivå 2;2021-05-28 (alebob)

Available from: 2021-05-20 Created: 2021-05-20 Last updated: 2025-10-21Bibliographically approved

Open Access in DiVA

fulltext(183 kB)776 downloads
File information
File name FULLTEXT01.pdfFile size 183 kBChecksum SHA-512
caaa396602842ce1b727458da90534b28fedaad0fc72f5339adca121c241af5c5506f658b6be59097814c5b6a265f8c75928ffa2517dda88049cda23925e3221
Type fulltextMimetype application/pdf

Other links

Publisher's full textScopus

Authority records

Pesämaa, Ossi

Search in DiVA

By author/editor
Pesämaa, Ossi
By organisation
Business Administration and Industrial Engineering
Business Administration

Search outside of DiVA

GoogleGoogle Scholar
Total: 781 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 161 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf